Edge Moor Power Plant
{{#badges: CoalSwarm| Climate change}}
On April 21, 2010, Pepco Holdings, Inc. (PHI) sold the generation assets owned by Conectiv Energy to Calpine Corporation. Based in Houston, Texas, Calpine Corporation is a leading electric generation company. Sold for $1.7 billion, the sale consisted of the Conectiv Energy power generation assets for $1.65 billion plus the value of the fuel inventory at closing, which was roughly $50 million.[1] The sale closed June 30, 2010. On July 1, 2010, the Edge Moor, DE and Deepwater, NJ plants began burning natural gas exclusively. All coal power will be discontinued. [2]
Edge Moor Power - Hay Road Power Complex near Wilmington, Delaware consists of four Edge Moor units totaling 720 megawatts (MW) powered by coal, natural gas and #6 fuel oil and eight Hay Road combustion turbine units totaling 1,082 MW powered by natural gas and low sulfur diesel.
Edge Moor Energy Center The first two units at Edge Moor Power Plant were completed in 1951, and have since been retired. Currently in operation are units 3, 4, 5 and 10. Unit 3 began commercial operation in 1954; Unit 10 in 1963; Unit 4 in 1966; and Unit 5 in 1973.
This plant was one of the first built with a fully centralized control system, which creates better operating efficiency and safety. When Calpine acquired the 725 MW facility in 2010 as part of its purchase of the Conectiv Energy assets, the company made the decision to discontinue burning coal at the site. Calpine’s decision to run Edge Moor primarily using natural gas is in keeping with its corporate philosophy to produce power in an environmentally sensitive fashion.
Currently, the plant uses state-of-the-art technologies, installed in early 2009, to control emissions. Unit 10 is a combustion turbine unit which uses low-sulfur diesel and is Black Start capable, meaning that in an emergency if the whole grid system goes down (causing a blackout), the self-sufficient unit can be used to bring the system back online. The unit can be started without needing a feed from a larger unit and, in turn, can feed the power needed by larger units to restart after a blackout.
Location: Wilmington, DE
Commercial Operation Date: January 1965
Calpine Net Interest Baseload (MW): 0 megawatts
Calpine Net Interest With Peaking (MW): 725 megawatts
Ownership: Calpine 100%
Technology: Natural gas-fired/oil, simple-cycle
Turbines: Two General Electric ST, one Westinghouse ST, one TP&M FT-4A-5
NERC Region: RFC [3]
Hay Road Energy Center Calpine acquired the 1,130 MW Hay Road facility in 2010 as part of its purchase of the Conectiv Energy assets. Units at the complex use an advanced dry combustion process to limit the formation of pollutants, thus preserving valuable water resources.
Location: Wilmington, DE
Commercial Operation Date: January 1989
Calpine Net Interest Baseload (MW): 1030 megawatts
Calpine Net Interest With Peaking (MW): 1130 megawatts
Ownership: Calpine 100%
Technology: Natural gas-fired/oil, combined-cycle
Turbines: Six Siemens V84.2, one ABB ST, one Alstrom ST
NERC Region: RFC [4]
Contents
Plant Data
- Owner: Calpine
- Parent Company: Calpine
- Plant Nameplate Capacity: 252 MW (Megawatts)
- Units and In-Service Dates: 75 MW (1954), 177 MW (1966)
- Location: 200 Hay Rd., Wilmington, DE 19809
- GPS Coordinates: 39.738611, -75.504167
- Coal Consumption:
- Coal Source:
- Number of Employees:
Emissions Data
- 2006 CO2 Emissions: 1,964,871 tons
- 2006 SO2 Emissions:
- 2006 SO2 Emissions per MWh:
- 2006 NOx Emissions:
- 2005 Mercury Emissions:
State | Plant | Owner/ Operator | County | Year | Tons of Coal Waste | Fly Ash Total | Bottom Ash Total |
---|---|---|---|---|---|---|---|
Delaware | Edge Moor | New Castle | Conectiv Energy Supply Inc | 2005 | 74,600 | 62,900 | 11,700 |
State | Facility ID# | Unit | Year | Op. hrs | Months | SO2 Tons | NOx Rate(lb/mmBtu) | NOx Tons | CO2 Tons | Heat Input(mmBtu) |
---|---|---|---|---|---|---|---|---|---|---|
DE | Edge Moor 593 | 10 | 2009 | 2 | 6 | 0.25 | 0.0 | 366 | ||
DE | Edge Moor 593 | 3 | 2009 | 6,541 | 12 | 738.9 | 0.13 | 212.6 | 317,033.8 | 3,095,937 |
DE | Edge Moor 593 | 4 | 2009 | 3,307 | 12 | 1,404.6 | 0.16 | 273.7 | 322,045.0 | 3,174,808 |
DE | Edge Moor 593 | 5 | 2009 | 217 | 12 | 150.3 | 0.19 | 72.8 | 46,266.8 | 594,682 |
DE | Facility Total | 2009 | ' | ' | ' |
State | Facility ID# | Unit | Year | Op. hrs | Months | SO2 Tons | NOx Rate(lb/mmBtu) | NOx Tons | CO2 Tons | Heat Input(mmBtu) |
---|---|---|---|---|---|---|---|---|---|---|
DE | Hay Road 7153 | 3 | 2009 | 1531 | 12 | 1.3 | 0.07 | 50.0 | 103,208.7 | 1,723,618 |
DE | Hay Road 7153 | 1 | 2009 | 1624 | 12 | 1.6 | 0.08 | 62.0 | 109,712.1 | 1,827,102 |
DE | Hay Road 7153 | 2 | 2009 | 1610 | 12 | 1.6 | 0.08 | 65.4 | 109,417.9 | 1,822,667 |
DE | Hay Road 7153 | 5 | 2009 | 1707 | 12 | 1.3 | 0.05 | 33.5 | 112,978.6 | 1,888,399 |
DE | Hay Road 7153 | 6 | 2009 | 1618 | 12 | 1.3 | 0.05 | 28.4 | 108,261.4 | 1,805,958 |
DE | Hay Road 7153 | 7 | 2009 | 1531 | 12 | 1.3 | 0.07 | 50.0 | 103,208.7 | 1,723,618 |
Facility Total | 2009 | ' | ' | ' |
Source: http://camddataandmaps.epa.gov/gdm/index.cfm?fuseaction=emissions.wizard
Articles and Resources
Sources
- ↑ Andre, "Pepco Holdings, Inc. Sells Conectiv Energy", PepcoConnect's Blog, April 21, 2010.
- ↑ "Calpine | Investor Relations | Press Release - April 21, 2010"
- ↑ Capline [1], Calpine website, accessed Dec 2010.
- ↑ Capline [2], Calpine website, accessed Dec 2010.
- ↑ Natural Resources Defense Council, "Contaminated Coal Waste: data and Projections for Existing and Proposed U.S. Coal Fired Plants", Natural Resources Defense Council, December 2009.
- Existing Electric Generating Units in the United States, 2005, Energy Information Administration, accessed Jan. 2009.
- Environmental Integrity Project, "Dirty Kilowatts: America’s Most Polluting Power Plants", July 2007.
- Facility Registry System, U.S. Environmental Protection Agency, accessed Jan. 2009.
- Carbon Monitoring for Action database, accessed Feb. 2009.
Related SourceWatch Articles
External Articles
This article is a stub. You can help by expanding it. |