Çebi Enerji power station

From SourceWatch
Jump to navigation Jump to search

{{#badges:CoalSwarm|Navbar-Turkeycoal}}Çebi Enerji power station is a proposed 700-megawatt (MW) coal-fired power plant in Tekirdağ province, Turkey.

Location

The map below shows the location of Marmaraereğlisi, the approximate location where the plant would be built in Tekirdağ province.

Loading map...

Background

The EIA for proposed power station was submitted in 2013.[1] In June 2015, Çebi Enerji began the environmental permitting process for the first 350-MW unit of the project.[2] As of April 2018 the prelicense application is still shown as under consideration on the EMRA website.[3] The second 350 MW unit has not been pursued. However, in March 2017, the company invested in a coal stock pile facility, indicating the possibility that a future expansion was still being considered.[4] As of June 2019 there has been no further progress and the project does not appear on permit lists of the Energy Market Regulatory Authority (EMRA). It appears to be cancelled.

Project Details

  • Sponsor: Çebi Enerji
  • Parent company:
  • Location: Marmaraereğlisi, Tekirdağ province, Turkey
  • Coordinates: 41.013446, 27.961648 (approximate)
  • Status: Cancelled
  • Detailed status:
  • Gross capacity: 700 MW (Units 1-2: 350 MW)
  • Type:
  • Projected in service:
  • Coal type:
  • Coal source: Imported[5]
  • Source of financing: