Ahdeb-PS-2 oil pipeline

From SourceWatch
Jump to navigation Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy.
Sub-articles:

Ahdeb-PS-2 oil pipeline is an existing oil pipeline, running from Ahdeb oilfield to PS-2 pumping station, Iraq.

Location

The pipeline runs from Ahdeb oilfield, Wasit governorate, to PS-2 pumping station, along the Iraq Strategic Pipeline, Muthanna governorate, Iraq.

Loading map...

Background

[1][2]

Pipeline Details

  • Operator: South Oil Company
  • Parent Company: Iraq National Oil Company
  • Current capacity: 24 inches
  • Length: 216 kilometers
  • Status: Operating
  • Start Year:

Articles and resources

References

  1. Table 6.9: Main crude oil pipelines in OPEC members, 2016, OPEC Annual Statistical Bulletin 2017, pp. 87-94.
  2. Ahdeb Oil Field, Wikimapia, accessed July 2018.

Related SourceWatch articles

External resources

External articles