Angelin Gas Pipeline
Jump to navigation
Jump to search

This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Angelin Gas Pipeline is a natural gas pipeline.[1]
Contents
Location
The pipeline runs from the Angelin field offshore Trinidad to the proposed Serrette platform which is located 60 km off the southeast coast of Trinidad.
Project Details
- Operator: BP Trinidad & Tobago LLC
- Parent Company: BP
- Current capacity: 600 million cubic feet per day
- Length: 13 miles / 21 km
- Status: Operating
- Start Year: 2019
Background
The project is owned by BP and operated by BP Trinidad &Y Tobago LLC. The pipeline was commissioned in February 2019.[2]
Articles and resources
References
- ↑ BPTT’s Angelin project gets the green light, BP, Jun. 2, 2017
- ↑ BP starts gas production from Trinidad and Tobago’s Angelin project, World Oil, Feb. 26, 2019