Angelin Gas Pipeline
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Angelin Gas Pipeline is a natural gas pipeline.[1]
Contents
Location
The pipeline runs from the Angelin field offshore Trinidad to the proposed Serrette platform which is located 60 km off the southeast coast of Trinidad.
Loading map...
Project Details
- Operator: BP Trinidad & Tobago LLC
- Parent Company: BP
- Current capacity: 600 million cubic feet per day
- Length: 13 miles / 21 km
- Status: Operating
- Start Year: 2019
Background
The project is owned by BP and operated by BP Trinidad &Y Tobago LLC. The pipeline was commissioned in February 2019.[2]
Articles and resources
References
- ↑ BPTT’s Angelin project gets the green light, BP, Jun. 2, 2017
- ↑ BP starts gas production from Trinidad and Tobago’s Angelin project, World Oil, Feb. 26, 2019