Angola LNG Terminal
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Angola LNG Terminal is an LNG terminal in Zaire Province, Angola, at the mouth of the Congo River.
Contents
Location
Description
Angola LNG terminal consists of a single natural gas liquefaction trains, with a capacity of 5.2 million metric tons per year (mtpa), or 0.75 billion cubic feet per day (bcfd). It is owned by Angola LNG Ltd., a consortium consisting of Chevron (36.4%), Angolan national oil company Sonangol (22.8%), Eni SPA (13.6%), Total (13.6%), and BP (13.6%).[1][2]
The project began in 1997. Construction began in 2008, with U.S. firm Bechtel acting as construction contractor. The project used proprietary gas liquefaction technology from ConocoPhillips. Construction was completed in 2012, and the first liquefied gas was produced in 2013. The project cost $10 billion.[2][3][4][5]
Since the plant was brought on line, it has suffered from repeated production interruptions due to technical failures — including a two-year shutdown from 2014-16. These problems have increased the plant's cost significantly, by an amount that sponsors have not disclosed.[6][7][8][9]
Project Details
- Owner: Angola LNG Ltd.
- Parent: Chevron (36.4%), Sonangol (22.8%), Eni SPA (13.6%), Total (13.6%), BP (13.6%)
- Location: Soyo, Zaire Province, Angola
- Coordinates: -6.11957, 12.33596 (exact)
- Capacity: 5.2 mtpa, 0.75 bcfd
- Additional Proposed Capacity:
- Status: Operating
- Type: Export
- Start Year: 2013
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Articles and resources
References
- ↑ The LNG Industry: Annual Report 2017, International Group of Liquefied Natural Gas Importers, accessed June 2017.
- ↑ 2.0 2.1 Angola LNG website, accessed June 2017.
- ↑ Angola LNG Terminal, Wikipedia, accessed April 2017
- ↑ Bechtel Proceeds with LNG Construction in Angola, Bechtel press release, 26 Feb. 2008.
- ↑ Bechtel to build Angola's first LNG plant, Oil & Gas Journal, 5 Feb. 2008.
- ↑ Angola LNG faces continued problems, The Economist Intelligence Unit, 30 May 2014.
- ↑ Angola LNG Resumes Shipments After Interruption, AllAfrica, 7 June 2016.
- ↑ Angola LNG production halted, LNG World News, 31 Oct. 2016.
- ↑ Angola LNG plant resumes production after December shutdown, Reuters, 4 Jan. 2017.