Anjar-Chotila Gas Pipeline
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
The Anjar-Chotila Gas Pipeline is a proposed natural gas pipeline.[1]
Contents
Location
The pipeline runs from Anjar, Gujarat to Chotila, Gujarat.[2]
Loading map...
Project Details
- Operator: Gujarat State Petronet Limited (GSPL)
- Parent Company: Gujarat State Petronet Limited (GSPL)
- Proposed capacity: 8.45 billion cubic meters per year
- Length: 122 miles / 196 kilometers
- Status: Proposed
- Start Year: 2021
Background
The pipeline is owned and operated by GSPL.[1]
Articles and resources
References
- ↑ 1.0 1.1 Environmental Impact Assessment, Anacon Labs, April 2018
- ↑ Annual Performance Highlights, Gujarat State Petronet, May 2019