Atlas Gas Pipeline

From SourceWatch
Jump to navigation Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy.
Sub-articles:

The Atlas Gas Pipeline is a proposed natural gas pipeline in Queensland, Australia.

Location

The pipeline would run from the Atlas gas field, approximately 20 km southwest of Wandoan, Queensland, to the Wallumbilla gas hub in Wallumbilla, Queensland.

Loading map...

Project Details

  • Operator: Jemena
  • Parent Company: Jemena
  • Current Capacity:
  • Proposed Capacity: 40 terajoules per day (36.99 million cubic feet per day)[1]
  • Length: 37 mi / 60 km
  • Status: Construction
  • Start Year: 2019

Background

Construction of the pipeline began in July 2019 and will cost an estimated US$140 million.[2]

Articles and resources

References

Related SourceWatch articles

External resources

External articles