Bataan-Cavite Gas Pipeline
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Bataan-Cavite Gas Pipeline is a proposed natural gas pipeline in the Philippines.[1]
Contents
Location
The pipeline runs from Bataan, Luzon to Rosario, Cavite.
Loading map...
Project Details
- Operator: PNOC
- Parent Company: PNOC
- Current Capacity:
- Proposed Capacity:
- Length: 25 mi / 40 km
- Status: Shelved
- Start Year: 2022
Background
The project would be owned and operated by the Philippine National Oil Company.[2] As of September 2019 there had no progress on the project in more than two years, and it appears to be shelved.
Articles and resources
References
- ↑ ASEAN Plan of Action for Energy Cooperation (APAEC) 2016-2025 , ASEAN, Nov. 7, 2016
- ↑ Philippines Discussing Batman-2 Pipeline With International Contractors, Pipeline & Gas Journal, July 2010