The proposed LNG terminal would be a floating terminal, and would be anchored in the port.
Project details
- Owner: Total S.A., Republic of Benin, Société Béninoise d’Energie Electrique
- Location: off the coast of Contonou, Benin
- Coordinates: 6.346843, 2.435208 (approximate)
- Capacity: 0.5 mtpa
- Status: Proposed
- Type: Import
- Start Year: 2021
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
Total S.A., the Republic of Benin, and the Société Béninoise d’Energie Electrique (SBEE) signed a Gas Supply Agreement and the Host Government Agreement for the development of a Liquefied Natural Gas (LNG) import floating terminal and the supply of up to 0.5 million tonnes per annum (Mtpa) of regasified LNG from Total’s global portfolio to Benin for 15 years, starting in 2021. Total will develop and operate the regasification infrastructure that will comprise a floating storage and re-gasification unit (FSRU) located offshore Benin and an offshore pipeline connexion to the existing and planned power plants in Maria Gléta.[2]