Cambodia LNG Project
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Cambodia LNG Project is a proposed LNG terminal in Phnom Penh, Cambodia.
Contents
Location
Loading map...
Project Details
- Owner:
- Parent: Cambodia Natural Gas Corp. (CNGC)
- Location: Phnom Penh, Cambodia
- Coordinates: 11.5792295, 104.6099912 (approximate)
- Capacity: Phase 2: 0.55 mtpa; Phase 3: 3 mtpa
- Status: Proposed
- Type: Import
- Start Year: Phase 2: 2021; Phase 3: 2024
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
In May 2019 Cambodia Natural Gas Corp. (CNGC) received government permission to proceed with a three-phase natural gas project in Phnom Penh. In the first phase, from 2019 to 2020, CNGC plans to import LNG by containers via maritime transportation. In the second phase that is targeted to be achieved in 2021-2023, CNGC plans to construct a gas power generation facility and supply gas to the facility using a chartered floating storage and regasification unit (FSRU) with 0.55 mtpa capacity. In the third phase CNGC aims to construct an import terminal with 3 mtpa capacity in 2024-2029.[1]