Central West Gas Pipeline
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
The Central West Gas Pipeline is an operating natural gas pipeline.[1]
Contents
Location
The pipeline runs from Marsden, Queensland to Forbes, Parkes, Narromine and Dubbo in the central west of New South Wales.[2]
Loading map...
Project Details
- Operator: APT Pipelines (NSW) Pty Limited
- Owner: APA Group
- Current Capacity: 10 terajoules per day (9.2 million cubic feet per day)
- Length: 158 Miles / 255 kilometers
- Status: Operating
- Start Year: 1999
Background
The Central West Gas Pipeline is operated by APT Pipelines (NSW) Pty Limited, a wholly owned subsidiary of the APA Group.[2]
Articles and resources
References
- ↑ State of the Energy Market, May 2017, Australian Energy Regulator, May 2017
- ↑ 2.0 2.1 NSW: Central West Gas Pipeline, Australian Electricity Market Commission, accessed February 2018