Chaozhou LNG Terminal
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Chaozhou LNG Terminal (华丰潮州LNG接收站) is a proposed LNG terminal in Guangdong, China.
Contents
Location
Loading map...
Project Details
- Owner: Sinoenergy 55%; Huafeng Group 45%
- Location: Raoping, Dacheng Town, Chaozhou, Guangdong, China
- Coordinates: 23.576582, 117.122439 (exact)
- Capacity: 1 mtpa, 0.14 bcfd
- Status: Construction
- Type: Import
- Start Year: 2019
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
Chaozhou Huafeng Group, Ningxia Baota Group, and Zhongtian Energy have proposed a 2 mtpa LNG import terminal in Raoping, Dacheng Town. The terminal is under construction and planned for 2018.[1][2] In February 2019 the project was listed as under construction by the International Gas Union[3]
Articles and resources
References
- ↑ "潮州闽粤经济合作区LNG储配站项目工程建设进展顺利," 潮州新闻网, 2016-07-22
- ↑ "中国最全的LNG接收站进度表,没有之一," Sohu, 2018-01-08
- ↑ 2019 World LNG Report, IGU, February 2019