Colbun LNG Terminal
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Colbun LNG Terminal is a proposed LNG terminal in Valparaíso, Chile. There have been no development updates since 2014 and the project is presumed to be cancelled.
Contents
Location
Project Details
- Parent: Colbun, AES Gener
- Location: Bay of Quintero, , Valparaíso, Chile
- Coordinates: -32.783333, -71.533333 (approximate)
- Capacity: 1.5 mtpa, 0.22 bcfd
- Status: Cancelled
- Type: Import
- Start Year:
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
Colbun LNG Terminal is a proposed LNG terminal in Valparaíso, Chile.[1]
The currently shelved floating and regasification terminal was a joint-venture project by Chilean energy companies Colbun and AES Gener. Colbun is owned by the Matte family, while AES Gener is a subsidiary of the US AES energy company.[2] The project had faced delays due to difficulty in finding a proper location for the terminal. Additionally, the expansion of the Quintero LNG Terminal has perhaps made the Colbun LNG Terminal project unnecessary, unless future conditions change. Both Colbun and AES Gener are already supplied with gas from the Quintero LNG Terminal.[3]
In 2014, AES Gener and Colbun cancelled their contract with Norwegian company Höegh, who would've installed the floating LNG ragasification plant, officially shelving the project.[4] There have been no development updates since then, and the project is presumed to be cancelled.
Articles and resources
References
- ↑ Colbun LNG Terminal, News, accessed April 2017
- ↑ AES Gener to withdraw from Chile LNG expansion, Argus News, March 13, 2017
- ↑ Chile's Colbun FSRU project hits delays as supply talks begin, ICIS, accessed August 2017
- ↑ [1] Colbún and Gener canceled deal to build LNG tanker,] Revista Nueva Minería y Energía, August 6, 2014