Creole Trail LNG Terminal

From SourceWatch
Jump to navigation Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy.
Sub-articles:

Creole Trail LNG Terminal was a proposed LNG terminal in Louisiana, United States.

Location

Loading map...

Project Details

  • Parent: Cheniere Energy
  • Location: Cameron Parish, Louisiana, United States
  • Coordinates: 29.85, -93.2 (approximate)
  • Capacity: 25 mtpa, 3.59 bcfd
  • Status: Cancelled
  • Type: Import
  • Start Year: Not applicable

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day

Background

Creole Trail LNG Terminal was a proposed LNG terminal in Louisiana, United States.[1] Though limited information about the proposed project is available and it seems the LNG terminal was cancelled, 94 miles of the associated Creole Trail Pipeline was completed and is currently interconnected with Natural Gas Pipeline Company of America, Transcontinental Gas Pipeline Corporation (Transco), Tennessee Gas Pipeline Company, Florida Gas Transmission Company, Bridgeline Holdings, L.P., Texas Eastern Gas Transmission (TETCO), and Trunkline Gas Company (Trunkline).[2]

Articles and resources

References

  1. Creole Trail LNG Terminal, A Barrel Full, 31 July 2015
  2. Creole Trail Pipeline, Cheniere, Accessed 18 July 2017

Related SourceWatch articles

External resources

External articles