Croatia Slovenia Austria Interconnection is a proposed pipeline in Croatia, Slovenia, and Austria.[1]

Location

The pipeline will run from Lučko, Croatia; to Zabok, Croatia; to Rogatec, Slovenia; to Kidričevo, Slovenia; to Murfeld, Austria; to Ceršak, Slovenia.[1]

Loading map...

Project Details

  • Owner: Plinacro d.o.o. (HR), Plinovodi d.o.o. (SI), Gas Connect Austria GmbH (AT)
  • Capacity: 5 billion cubic meters per year
  • Length: 70 km / 43.5 miles
  • Status: Proposed
  • Start Year: 2023

Background

The pipeline has been approved for inclusion on the European Commission's Projects of Common Interest list, meaning it will receive public funding from the EU. According to the European Commission, "The PCIs includes: Construction of a new pipeline of a capacity up to 5 bcm/y in both directions: Luko Zabok (HR), DN700 with 36 km length and Zabok - Rogatec (SI) DN700 with 34 km length; Upgrade of CS for higher operational pressure in the existing M1/1 and M2/1 pipelines, higher flow and bidirectional operation. The project aims to assure additional necessary compressor power (30 MW) for the PCI 6.26 Cluster Croatia - Slovenia - Austria at Rogatec; two compressor stations (CS2 Slobodnica: 5 MW and CS3 Zabok: 5 MW) on the HR gas transmission system that will enable reverse flow with the neighbouring countries and transport of gas from the Krk LNG terminal to the neighbouring countries; construction of a new compressor station of 13.7 MW in Murfeld (AT) and a pipeline of 26.1 km ensuring the physical reverse flow capacity between SI and AT; adjustment of SI part to operating parameters of the transmission system of the Austrian TSO, increasing the transmission capacity and enabling bidirectional operation. The project consits of a pipeline with a length of 0.16 km and a diameter of DN800. The expected incremental capacity brought by the project in the direction Murfeld (AT) -> Ceršak (SI) is 78.7 GWh/d and 162 GWh/d in the opposite direction; adjustment to operating parameters of the transmission system of the Croatian TSO, increasing the transmission capacity and enabling bidirectional operation. The project consits of a pipeline with a length of 0.16 km and a diameter of DN800. The pipeline has already been awarded €4,825,000 EUR ($5,352,190.79 USD) worth of public funds."[1]