Hail Creek mine
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of Australia and coal | |
Sub-articles: | |
Related articles: | |
|
The Hail Creek mine is an open cut coal mine located 20 kilometres north west of Clermont in the Bowen Basin in central Queensland. Rio Tinto, which has a 71 per cent interest in the mine, states on its website that coal from the mine is sold to "customers in Asia and Europe with up to 12 million tonnes of thermal coal per annum."[1]
Rio Tinto states that the "Hail Creek Mine's resources were discovered in 1968 with project feasibility work completed in the 1970s. In 2001 Hail Creek Mine started construction and was officially opened in 2003."[1]
On its website, Rio Tinto states that as of the end of 2008 the mine employed 436 people.[2]
Rio Tinto states that "in 2008 the mine produced more than six million tonnes of hard and semi-soft coking coal. After being washed and prepared for sale, the coal is loaded onto trains for transportation 100km to the Dalrymple Bay Coal terminal where it is shipped to international customers. Hail Creek Mine had marketable reserves of 167 million tonnes as at 31 December 2008."[2]
Coal from the mine is transported over 100km by train to the Dalrymple Bay Coal Terminal for shipping overseas.[2]
Contents
Joint venture
Rio Tinto Coal Australia manages the operation on behalf of the joint venture partners, Queensland Coal Pty Limited (82 per cent), Nippon Steel Australia Pty Ltd (8 per cent), Marubeni Coal Pty Ltd (6.67 per cent) and Sumisho Coal Development Pty Ltd (3.33 per cent).[1]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 Rio Tinto, "Hail Creek mine", Rio Tinto website, accessed July 2010.
- ↑ 2.0 2.1 2.2 Rio Tinto, "Hail Creek Mine: mining and production", Rio Tinto website, accessed July 2010.