High Island Offshore Gas Pipeline System
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
High Island Offshore Gas Pipeline System is an operating natural gas pipeline.[1]
Contents
Location
The pipeline runs from gas fields located in the Galveston, Garden Banks, West Cameron and East Breaks areas of the Gulf of Mexico to a junction platform in West Cameron Block 167.[2]
Project Details
- Operator: Genesis Energy
- Current capacity: 1.8 billion cubic feet per day
- Proposed capacity:
- Length: 287 miles / 462 km
- Status: Operating
- Start Year: 1978
Background
The High Island Offshore Gas Pipeline System (HIOS) is owned and operated by Genesis Energy.[3] In November 2015 Genesis announced that it had sought permission from FERC to repurpose HIOS to send onshore gas to the proposed Delfin LNG deep water export terminal, while sending gas that had been flowing through HIOS through Genesis's Stingray Pipeline.[4] In September 2017 FERC approved this request on the grounds that HIOS’s gathering facilities have "the capacity to deliver its currently transported volumes of gas to Stingray Pipeline, and that Stingray Pipeline’s pressure will permit it to accept and transport the gas without causing operational problems."[5]
Opposition
In June 2015 the Center for Biological Diversity submitted a Motion To Intervene with FERC against the Delfin FLNG facility that would be supplied by HIOS. The motion states: "The Center, on behalf of its members, strongly believes that the Project’s construction and operation, including exporting U.S. natural gas abroad, is not in the “public interest” because it will: (1) increase natural gas drilling in the United States, including the use of dangerous, controversial, and inadequately-regulated onshore and offshore hydraulic fracturing or “fracking” methods that contaminate water, degrade habitat, pollute the air, and require huge quantities of water; (2) harm wildlife and habitat and diminish air and water quality; (3) increase global warming due to emissions from wells, the energy intensive process of liquefying natural gas, and the ultimate use of the product; and (4) cause an increase in domestic gas prices for American homeowners. C.f. 18 C.F.R. § 153.7(c). Our members will be directly affected by the construction and operation of the Project."[6]
Articles and resources
References
- ↑ High Island Offshore Gas Pipeline System, Wikipedia, accessed January 2018
- ↑ Gulfterra Energy Partners SEC Form S-1, SEC, Aug. 26, 1999
- ↑ HIGH ISLAND OFFSHORE SYSTEM (“HIOS”), Genesis Energy, accessed January 2018
- ↑ Offshore pipeline plans to serve Delfin LNG Argus Media, Nov. 25, 2015
- ↑ 160 FERC ¶ 61,130: ORDER ISSUING CERTIFICATE, GRANTING ABANDONMENT, AND ON CLARIFICATION, FERC, Sep. 28, 2017
- ↑ Center For Biological Diversity, Motion To Intervene, Docket No. CP15-490-000, FERC, Jun. 11, 2015
Related SourceWatch articles
External resources
External articles
Wikipedia also has an article on the High Island Offshore Pipeline System (High Island Offshore System). This article may use content from the Wikipedia article under the terms of the Creative Commons Attribution-ShareAlike 3.0 Unported License].