Kisarazu Rinkai 2 Gas Pipeline
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Kisarazu Rinkai 2 Gas Pipeline is an operating natural gas pipeline in Japan.[1]
Contents
Location
The pipeline runs from Kisarazu in Chiba prefecture to Kimitsu in Chiba prefecture.
Loading map...
Project Details
- Operator: Tokyo Gas
- Parent Company: Tokyo Gas
- Current Capacity:
- Proposed Capacity:
- Length: 5.3 miles / 8.6 kilometers
- Status: Proposed
- Start Year: 2015
Background
The pipeline is owned and operated by Tokyo Gas. The pipeline has a maximum operating pressure of 7 MPa and a diameter 300 mm.[1][2]
Articles and resources
References
- ↑ 1.0 1.1 Saibu Gas to Build New Pipeline Outline of Supply Plans for FY2014, Tokyo Gas, 2014
- ↑ 東京ガス、大阪ガス及び東邦ガスの事業概況(詳細) METI, accessed Dec 2019