Kisarazu Rinkai 2 Gas Pipeline

From SourceWatch
Jump to navigation Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy.
Sub-articles:

Kisarazu Rinkai 2 Gas Pipeline is an operating natural gas pipeline in Japan.[1]

Location

The pipeline runs from Kisarazu in Chiba prefecture to Kimitsu in Chiba prefecture.

Loading map...

Project Details

  • Operator: Tokyo Gas
  • Parent Company: Tokyo Gas
  • Current Capacity:
  • Proposed Capacity:
  • Length: 5.3 miles / 8.6 kilometers
  • Status: Proposed
  • Start Year: 2015

Background

The pipeline is owned and operated by Tokyo Gas. The pipeline has a maximum operating pressure of 7 MPa and a diameter 300 mm.[1][2]

Articles and resources

References

Related SourceWatch articles

External resources

External articles