Lianyungang LNG Terminal
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Lianyungang LNG Terminal (中石化连云港LNG接收站) is a proposed LNG terminal in Jiangsu, China.
Contents
Location
Loading map...
Project Details
- Owner: Sinopec
- Location: Lianyungang, Jiangsu Province, China
- Coordinates: 32.526845, 121.412712 (exact)
- Capacity:
- Additional Proposed Capacity: 3 mtpa, 0.43 bcfd
- Status: Shelved
- Type: Import
- Start Year:
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
Lianyungang LNG Terminal is a proposed 3 mtpa LNG terminal in Jiangsu, China, sponsored by Sinopec.[1] In 2016 it was reported that preliminary work had begun.[2]
As of March 2019 there was no further news about the project and it appears to be shelved.
Articles and resources
References
- ↑ Lianyungang, Jiangsu Province will be built to accept 3 million tons of LNG projects, Sinopec News, 1 August 2013
- ↑ "中国LNG接收站建设情况(截至2016年6月)," Gingshine, 2016-08-01