Niigata-Sendai Gas Pipeline
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Niigata-Sendai Gas Pipeline is an operating natural gas pipeline.[1]
Contents
Location
The pipeline runs from Seiro in Niigata prefecture to Sendai in Miyagi prefecture.[2]
Loading map...
Project Details
- Operator: JAPEX
- Parent Company: JAPEX
- Current Capacity: 1.64 billion cubic meters per year
- Length: 162 miles / 261 kilometers
- Status: Operating
- Start Year: 1996
Background
The pipeline is owned and operated by JAPEX.[1]
Articles and resources
References
- ↑ 1.0 1.1 Koriyama North Pipeline To Be Constructed, JAPEX, Jul. 24, 2013
- ↑ Hideichi Okada Commencement of Operation at Soma LNG Terminal Japan Petroleum Exploration Co., Ltd. (JAPEX), March 28, 2018