Pakistan GasPort LNG Terminal
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Pakistan GasPort LNG Terminal is an LNG terminal in Port Qasim, Karachi, Sindh, Pakistan.
Contents
Location
Loading map...
Project Details
- Owner: Pakistan GasPort Consortium Limited (PGPC)
- Parent: Pakistan GasPort Limited
- Location: Port Qasim, Karachi, Sindh, Pakistan
- Coordinates: 24.7749916, 67.288333 (exact)
- Capacity: 5.2 mtpa, 0.75 bcfd
- Additional Proposed Capacity:
- Status: Operating
- Type: Import
- Start Year: 2017
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
Pakistan GasPort LNG Terminal is a proposed LNG import terminal in Sindh, Pakistan. It is planned for operation in 2017.[1]
A consortium comprising Xinjiang Petroleum Engineering Company Limited (XPE), CCCC Third Harbor Consultants Company Limited and CCCC Third Harbor Engineering Company Limited is providing Engineering, Procurement, Supply, Dredging and Construction services to the project.[2]
The terminal entered commercial operation in November 2017.[3]
Articles and resources
References
- ↑ "Procurement process," PGP Consortium Limited, 2016
- ↑ "About Us," Pakistan Gas Port, accessed August 2017
- ↑ Pakistan's second LNG import terminal to restart on Dec. 8 - company, Reuters, Dec. 7, 2017