Penglai LNG Terminal
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Penglai LNG Terminal (宝塔石化蓬莱LNG接收站) is a proposed LNG import terminal in Shandong, China.
Contents
Location
Loading map...
Project Details
- Owner: Ningxia Baota Chemical Group
- Location: Penglai, Yantai, Shandong Province, China
- Coordinates: 37.776013, 120.612407 (exact)
- Capacity: 2.8 mtpa, 0.4 bcfd
- Additional Proposed Capacity:
- Status: Construction
- Type: Import
- Start Year: 2020
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
Penglai LNG Terminal is a proposed 2.8 mtpa LNG import terminal in Shandong, China. The project is proposed by Ningxia Baota Chemical Group. Construction is planned for 2018 and operation for 2020.[1] Satellite photography from Planet shows construction occurring between January 2019 and July 2019.
Articles and resources
References
- ↑ Shandong Penglai LNG receiving station project feasibility study report will be held in Xiamen, Nxbtsh.com, 12 June 2017