Pinghu LNG Terminal
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Pinghu LNG Terminal is a proposed LNG terminal in Dushan Harbor, Pinghu, Zhejian province, China.
Contents
Location
Loading map...
Project Details
- Owner:
- Parent: Jiaxing Gas 34%, GCL 33%, Hangzhou Gas 33%
- Location: Dushan Harbor, Pinghu, Zhejian province, China
- Coordinates: 30.579815, 121.035783 (approximate)
- Capacity: 1 mtpa, 0.14 bcfd
- Status: Construction
- Type: Import
- Trains: 2
- Start Year: 2019
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
Jiaxing Gas and Hangzhou Gas are building a 1 mtpa terminal in the Dushan Harbor area of Pinghu, China.[1]
Articles and resources
References
- ↑ LNG Peak Shaving Terminal, Zhejiang, Halcrow Sea, accessed August 2019