Qidong LNG Terminal (广汇能源启东LNG接收站转运站), also called Guanghui LNG Terminal, is an LNG import terminal in Jiangsu, China.
Contents
Location
Loading map...
Project Details
- Owner: Guanghui Energy Group, Shell
- Location: Qidong, Nantong, Jiangsu Province, China
- Coordinates: 32.041846, 121.746907 (exact)
- Capacity: 1.15 mtpa, 0.09 bcfd
- Additional Proposed Capacity: 1.85 mtpa
- Status: Operating
- Type: Import
- Start Year: 2017
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
Qidong LNG Terminal (广汇能源启东LNG接收站转运站) is an LNG import terminal in Jiangsu, China.[1] The terminal received its first shipment on 4 June 2017.[2] In November 2018 an additional 160,000 m3 storage tank was commissioned, raising the terminal's capacity to 1.15 mtpa.[3] A further expansion that would raise capacity to 3 mtpa is under construction and scheduled for completion in 2020.[3]
Articles and resources
References
- ↑ eo封面 | 闯入者广汇 View.inews.qq.com, 8 August 2017
- ↑ Qidong LNG terminal receives first shipment Interfax Global Energy, 12 June 2017
- ↑ 3.0 3.1 广汇能源启东LNG接收站迎重要进展 16万方储罐明年一季度将投用, SCTN, Mar. 8, 2019