Rangeland Oil Pipeline
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Rangeland Oil (RIO) Pipeline is an oil pipeline in the United States.[1]
Contents
Location
The pipeline runs from RIO State Line Terminal in Loving County, Texas, to Midland, Texas.
Loading map...
Project Details
- Operator: Rangeland Energy[1]
- Current capacity: 145,000 barrels per day
- Proposed capacity:
- Length: 177 kilometers (110 miles)
- Status: Operating
- Start Year: 2016
Background
The RIO Pipeline consists of 110 miles of 12-inch pipeline bridging the Delaware and Midland basins of the Permian Basin in Texas. It runs from the RIO State Line Terminal in Loving County, Texas to Rangeland’s Geneva and Zurich terminals in Midland, Texas. The RIO Pipeline can transport a maximum of 145 Mbpd. It was commissioned in 2016.[1]
Articles and resources
References
- ↑ 1.0 1.1 1.2 Rangeland Oil Pipeline, Rangeland Energy website, accessed September 2017