Rudong LNG Terminal
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Rudong LNG Terminal (保利协鑫如东LNG接收站) is a proposed LNG terminal in Jiangsu, China.
Contents
Location
Loading map...
Project Details
- Owner: GCL-Poly
- Location: Rudong, Nantong, Jiangsu, China
- Coordinates: 32.526845, 121.412712 (exact)
- Capacity:
- Proposed Capacity: 3 million tonnes per year
- Status: Proposed
- Type: Import
- Start Year: 2022
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
Rudong LNG Terminal (保利协鑫如东LNG接收站) is a proposed LNG terminal in Jiangsu, China.[1] GCL-Poly plans to finish building the terminal in 2022.[2]
Articles and resources
References
- ↑ 【环境评价】协鑫汇东江苏如东LNG接收站项目环境影响评价第一次公示 Zgrd.gov.cn, 20 February 2017
- ↑ China private group GCL hires CNOOC execs to fast-track gas business, Reuters, Oct. 15, 2018