Teluk Lamong LNG Terminal
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Teluk Lamong LNG Terminal is a proposed LNG terminal in Teluk Lamong, East Java, Indonesia.
Contents
Location
Loading map...
Project Details
- Owner:
- Parent: PT Perusahaan Gas Negara, PT Pelindo III[1]
- Location: South Sulawesi coastline, Sulawesi, Indonesia
- Coordinates: -7.2038832, 112.669148 (exact)
- Capacity: 0.21 mtpa, 0.03 bcfd
- Status: Construction
- Type: Import
- Start Year: 2019
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
The terminal is scheduled for completion in Q4 2019. Initial capacity will be 0.21 mtpa but PT Purasahaan Gas Negara has stated that capacity will increase to meet local demand.[2]
Articles and resources
References
- ↑ PGN collaborates with Pelindo III to develop LNG terminal in East Java, Netral, Mar. 29, 2019
- ↑ Indonesia gas utility builds LNG terminal for East Java distribution, Hellenic Shipping News, Mar. 30, 2019