Yantai LNG Terminal
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Yantai LNG Terminal (保利协鑫烟台LNG接收站) is a proposed LNG terminal in Shandong, China.
Contents
Location
Loading map...
Project Details
- Owner: GCL-Poly
- Location: Fushan Dajijia Town, Yantai, Shandong, China
- Coordinates: 37.711187, 121.080172 (approximate)
- Capacity:
- Proposed Capacity: 3 mtpa, 0.43 bcfd
- Status: Proposed
- Type: Import
- Start Year: projected 2020
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
Yantai LNG Terminal is a proposed 3 mtpa LNG import terminal in Shandong, China. The terminal is sponsored by GCL-Poly and expected to be in operation in 2020.[1]
In 2018 it was reported to be in "planning preparation."[2]
Articles and resources
References
- ↑ 保利協鑫敲定百億煙台港LNG項目, Takungpao.com.hk, 15 August 2017
- ↑ "中国最全的LNG接收站进度表,没有之一," Sohu, 2018-01-08