Zhejiang Ningbo LNG Terminal is an LNG terminal in Baifeng Town, Beilun District, Ningbo Prefecture, Zhejiang, China.
Contents
Location
Loading map...
Project Details
- Owner: CNOOC Gas & Power Group
- Parent: CNOOC 51%, Zhejian Energy Group 29%, Ningbo Power Development Co. 20%
- Location: Beilun, Ningbo, Zhejiang, China
- Coordinates: 29.893989, 122.091771 (exact)
- Capacity: 3 mtpa, 0.43 bcfd
- Status: Operating
- Type: Import
- Start Year: 2012
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Background
Zhejiang Ningbo LNG Terminal is an LNG terminal in Zhejiang, China.[1]
The Zhejiang Ningbo LNG Terminal was commissioned in 2012 with LNG imported from Qatar. The first phase of the project includes three 160,000 cubic meter tanks and a receiving capacity of 3 mtpa.[2] [3]
Expansion Project Details
- Owner: CNOOC Gas & Power Group
- Parent: CNOOC
- Location: Beilun, Ningbo, Zhejiang, China
- Coordinates: 29.893989, 122.091771 (exact)
- Capacity: 3 mtpa, 0.43 bcfd
- Status: Construction
- Type: Import
- Start Year: 2020
Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day
Expansion Background
The second phase has began construction in June 2018. The proposed operating date is 2020. The proposed capacity is 3 mta.[4]
Articles and resources
References
- ↑ Zhejiang Ningbo LNG Terminal, A Barrel Full, accessed April 2017
- ↑ CNOOC's Zhejiang Ningbo LNG terminal gets Qatari commissioning cargo, Platts, September 24, 2017
- ↑ "浙江LNG接收站成功接卸第100船液化天然气"people.cn, 2017-4-18
- ↑ Expansion of the largest LNG receiving station in Zhejiang, CNE Energy, April 16, 2019