Zhejiang Ningbo LNG Terminal

From SourceWatch
Jump to navigation Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy.
Sub-articles:

Zhejiang Ningbo LNG Terminal is an LNG terminal in Baifeng Town, Beilun District, Ningbo Prefecture, Zhejiang, China.

Location

Loading map...

Project Details

  • Owner: CNOOC Gas & Power Group
  • Parent: CNOOC 51%, Zhejian Energy Group 29%, Ningbo Power Development Co. 20%
  • Location: Beilun, Ningbo, Zhejiang, China
  • Coordinates: 29.893989, 122.091771 (exact)
  • Capacity: 3 mtpa, 0.43 bcfd
  • Status: Operating
  • Type: Import
  • Start Year: 2012

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day

Background

Zhejiang Ningbo LNG Terminal is an LNG terminal in Zhejiang, China.[1]

The Zhejiang Ningbo LNG Terminal was commissioned in 2012 with LNG imported from Qatar. The first phase of the project includes three 160,000 cubic meter tanks and a receiving capacity of 3 mtpa.[2] [3]

Expansion Project Details

  • Owner: CNOOC Gas & Power Group
  • Parent: CNOOC
  • Location: Beilun, Ningbo, Zhejiang, China
  • Coordinates: 29.893989, 122.091771 (exact)
  • Capacity: 3 mtpa, 0.43 bcfd
  • Status: Construction
  • Type: Import
  • Start Year: 2020

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day

Expansion Background

The second phase has began construction in June 2018. The proposed operating date is 2020. The proposed capacity is 3 mta.[4]