Difference between revisions of "India and coal"
Line 113: | Line 113: | ||
===Distribution of coal reserve by states (2012)<ref name=CoalMinistry2012/>=== | ===Distribution of coal reserve by states (2012)<ref name=CoalMinistry2012/>=== | ||
{| class="sortable wikitable" | {| class="sortable wikitable" | ||
− | ! State !! Coal Reserves<br><small>(in million tonnes)</small> | + | ! State !! Coal Reserves<br><small>(in million tonnes)</small> |
|- | |- | ||
− | | Tamil Nadu || align="right"|80,356.21 | + | | Tamil Nadu || align="right"|80,356.21 |
|- | |- | ||
− | | Jharkhand || align="right"|80,356.20 | + | | Jharkhand || align="right"|80,356.20 |
|- | |- | ||
− | | Odisha || align="right"|71,447.41 | + | | Odisha || align="right"|71,447.41 |
|- | |- | ||
− | | Chhattisgarh || align="right"|50,846.15 | + | | Chhattisgarh || align="right"|50,846.15 |
|- | |- | ||
− | | West Bengal || align="right"|30,615.72 | + | | West Bengal || align="right"|30,615.72 |
|- | |- | ||
− | | Madhya Pradesh || align="right"|24,376.26 | + | | Madhya Pradesh || align="right"|24,376.26 |
|- | |- | ||
− | | Telangana || align="right"|22,154.86 | + | | Telangana || align="right"|22,154.86 |
|- | |- | ||
− | | Maharashtra || align="right"|10,882.09 | + | | Maharashtra || align="right"|10,882.09 |
|- | |- | ||
− | | Uttar Pradesh || align="right"|1,061.80 | + | | Uttar Pradesh || align="right"|1,061.80 |
|- | |- | ||
− | | Meghalaya || align="right"|576.48 | + | | Meghalaya || align="right"|576.48 |
|- | |- | ||
− | | Assam || align="right"|510.52 | + | | Assam || align="right"|510.52 |
|- | |- | ||
− | | Nagaland || align="right"|315.41 | + | | Nagaland || align="right"|315.41 |
|- | |- | ||
− | | Bihar || align="right"|160.00 | + | | Bihar || align="right"|160.00 |
|- | |- | ||
− | | Sikkim || align="right"|101.23 | + | | Sikkim || align="right"|101.23 |
|- | |- | ||
− | | Arunachal Pradesh || align="right"|90.23 | + | | Arunachal Pradesh || align="right"|90.23 |
|- | |- | ||
− | | Assam || align="right"|2.79 | + | | Assam || align="right"|2.79 |
|- | |- | ||
− | |''TOTAL'' || align="right"|''293,497.15'' | + | |''TOTAL'' || align="right"|''293,497.15'' |
|} | |} | ||
Revision as of 00:11, 21 July 2016
{{#badges: CoalSwarm|Navbar-Indiacoal}}
For state-by-state maps, tables, and overviews, see:
- Andhra Pradesh and coal
- Bihar and coal
- Chhattisgarh and coal
- Gujarat and coal
- Haryana and coal
- Jharkhand and coal
- Karnataka and coal
- Madhya Pradesh and coal
- Maharashtra and coal
- Odisha and coal
- Punjab and coal
- Rajasthan and coal
- Tamil Nadu and coal
- Uttar Pradesh and coal
- West Bengal and coal
Contents
- 1 Introduction
- 2 2007-2012: The Rush to Build Coal Plants
- 3 Domestic Coal Mining
- 4 Proposed coal projects
- 4.1 Proposed coal-to-liquids projects
- 4.2 Estimated number of new plants approved
- 4.3 Andhra Pradesh, India
- 4.4 Environment Minister approves sixteen coal projects
- 4.5 DB Power's proposed Dharamjaigarh coal mine and plant
- 4.6 The shortage of coal, rising coal prices, and the effect on proposed plants
- 5 Coal Exports
- 6 Coal Imports
- 7 Funding and Programs for Clean Energy and Climate Change
- 8 Reports
- 9 Citizen Action
- 10 Community impacts and resistance
- 10.1 August 2007: 6,000 people face displacement in Madhya Pradesh
- 10.2 July 2010: Two killed, 150 injured in Andhra Pradesh
- 10.3 January 2010: Hanakon thermal project shelved after intense protest; protesters tortured
- 10.4 January 2011: 25 people injured in Chhattisgarh protests
- 10.5 February 2011: Two killed, 25 injured in Andhra Pradesh
- 10.6 April 2011: Four killed in protests against anti-encroachment drive in Jharkand
- 10.7 May 2011: Mango farmers protest coal plants in Maharashtra's Ratnagiri district
- 10.8 June 2011: Three deaths believed to be related to coal mafia
- 10.9 September 2011: Moving Planet day of action
- 10.10 September 2011: Greenpeace calls for moratorium on new coal projects in Singrauli
- 10.11 November 2011: Activist nun who fought Indian mining companies brutally murdered
- 11 Carbon credits
- 12 Coal India to use GPS to stop pilferage
- 13 Citizens Groups Tracking Coal Power and Mining in India
- 14 Government Agencies
- 15 Notes
- 16 Additional resources
- 17 Maps
Introduction
Coal is the main commercial energy fuel in India, amounting to 61% of installed electrical capacity in July 2016.[1]
India's Ministry of Coal estimates the country has "proved" coal reserves at 125.9 billion tonnes and coal resources at 301 billion tonnes; however Indian coal is of low quality as it has a high ash content.[2]
2007-2012: The Rush to Build Coal Plants
For more details, see Proposed coal plants in India and Existing coal plants in India
2007-2011: The rush begins
As shown in Table 1 below, India's coal plant capacity was relatively stagnant through the end of the 10th Plan on March 31, 2007. Since then, growth has been rapid, including a 79% increase in capacity from March 31, 2007 through May 31, 2012 (mostly since the beginning of 2010) and an additional 76% increase represented by projects currently under construction. [3][4]
Table 1: Coal plant capacity additions since 1985, and current capacity under construction
Date | Capacity (MW) | Growth (MW) | Growth rate | Period |
31-Mar-85 | 26,311 | |||
31-Mar-92 | 44,791 | 18,480 | 70% | (7 years) |
31-Mar-97 | 54,154 | 9,363 | 21% | (5 years) |
31-Mar-02 | 62,131 | 7,977 | 15% | (5 years) |
31-Mar-07 | 63,951 | 1,820 | 3% | (5 years) |
31-May-12 | 114,782 | 50,831 | 79% | (5 years, 2 months) |
Under construction 5/31/12 | 87,122 | 76% |
2012: The plant boom shows signs of slowing, but hundreds of projects remain in the pipeline
In August 2011, a study by Prayas Energy Group found approximately 590,000 megawatts (MW) of coal projects in the pipeline, having received or expecting imminent environmental approval. Using data from the Ministry of Environment and Forest, Prayas found that 192,913 MW of coal and gas capacity had received environmental clearance, with another 508,907 MW in the pipeline and expected to be approved, for a total of 701,820 MW. Of this total, Prayas estimated that coal accounts for 84%, or 589,529 MW.[5][6]
However, since the release of the Prayas study there has been a major slowdown among planners of new coal capacity.
As shown in Table 2, 41,650 MW of projects were deferred (i.e. progress was on hold) as of May 31, 2012, and an additional 22,420 MW of projects had been cancelled. The reasons for the slowdown were multiple: (1) Dramatic rises in the cost of imported coal; (2) Insufficiency in domestic coal output; (3) An unfolding domestic crisis over the integrity of the coal allocation process, known as "Coalgate," (4) Difficulties obtaining financing. Nevertheless, 87,122 MW or projects were under construction as of May 31, 2012 and an additional 68,200 MW of projects were in advanced development, having achieved most milestones (permits, water, land, coal, and financing).
Table 2: Summary statistics for proposed coal plants in India (May 2012)
Status | # of Plants | Capacity (MW) | Annual Tons of CO2 |
---|---|---|---|
Proposed | 133 | 157,122 | 929,169,540 |
Early development | 114 | 157,002 | 928,462,853 |
Advanced development | 58 | 66,220 | 391,605,267 |
Construction | 109 | 87,122 | 515,213,441 |
Newly commissioned (since 1/1/2010) | 62 | 37,378 | 221,042,309 |
Deferred | 30 | 50,270 | 297,281,739 |
Cancelled | 19 | 22,420 | 132,585,172 |
Unconfirmed | 20 | 24,685 | 145,979,704 |
Uncertain | 6 | 14,660 | 86,694,854 |
Total | 551 | 616,879 | 3,648,034,879 |
Ultra Mega Power Projects
For more details, see Ultra Mega Power Projects in India.
India has proposed a series of 'ultra mega' coal-fired power stations of 4,000 megawatts or more.
The program of Ultra Mega Power Projects (UMPP) was introduced in 2005 by the Ministry of Power in association with the Central Electricity Authority and the Power Finance Corporation to streamline the commissioning of large thermal coal plants.[7][8]
The Ministry of Power stated that the projects would be 'super critical' coal plants which would either be located at the pithead of specific coal deposits or at coastal projects to be based on imported coal.
In an attempt to make the projects attractive for private sector investors, the Ministry of Power, the Central Electricity Authority and the Power Finance Corporation determined that it "was deemed necessary to provide the site, fuel linkage in captive mining blocks, water and obtain environment and forests clearance, substantial progress on land acquisition leading to possession of land, through a Shell Company." The shell companies were also given the initial task for finalizing agreements with power purchasers.[9]
Financing of India's coal plants
Financing of India's coal rush is an under-studied topic. The Power Finance Corporation is the lead government-owned entity, and it is the "nodal agency" for the program of Ultra Mega Power Projects. International public investment institutions such as the World Bank have also played a significant role in financing India's coal plants, and that role has been highly controversial due to the application of funds from the Clean Development Mechanism for new coal plants. Private equity has been a smaller factor but is growing rapidly.[10]
Domestic Coal Mining
As on April 1, 2014, India had 301.56 billion tonnes of coal resources.[11] The production of coal was 532 million tonnes in 2010-11, making India rank 3rd in world coal production.[12]
Distribution of coal reserve by states (2012)[11]
State | Coal Reserves (in million tonnes) |
---|---|
Tamil Nadu | 80,356.21 |
Jharkhand | 80,356.20 |
Odisha | 71,447.41 |
Chhattisgarh | 50,846.15 |
West Bengal | 30,615.72 |
Madhya Pradesh | 24,376.26 |
Telangana | 22,154.86 |
Maharashtra | 10,882.09 |
Uttar Pradesh | 1,061.80 |
Meghalaya | 576.48 |
Assam | 510.52 |
Nagaland | 315.41 |
Bihar | 160.00 |
Sikkim | 101.23 |
Arunachal Pradesh | 90.23 |
Assam | 2.79 |
TOTAL | 293,497.15 |
Proposed coal projects
Proposed coal-to-liquids projects
In March 2009 the Indian government announced that it had awarded two coal blocks for the development of two different coal-to-liquids projects in the state of Orissa. These are:
- the north Arkhapal coal block to Strategic Energy Technology Systems Ltd, a 50:50 joint venture between Tata Power and Sasol Synfuels International, the international synfuels subsidiary of Sasol. It is projected that the $10 billion.[13] plant would produce 80,000 barrels of crude oil a day.[14] In early 2010 Orissa's Chief minister Naveen Patnaik told reporters that "though we have not identified the location, the proposed plant will be somewhere in the state." It was also reported that the coal would come from the Srirampur area in Talcher. The Business Standard also stated that the project "requires 3,000 acre of land for its main plant, additional land would be required for setting up coal mines, benefication plants, coal handling plants, water reservoirs, power plants and a township" and would involved the establishment of a 1600 megawatt power station. The newspaper also reported that the joint venture was "yet to make a formal application" for the plant the company was pressing the state government "to provide adequate facilities for early commissioning of the project."[15] (See Srirampur Coal-to-Liquids Project for more details).
- the Ramchandi block to Jindal Steel and Power Limited (JSPL) is projected to produce 80,000 barrels per day will use the German Lurgi technology. The plant is proposed to be established at Kishore Nagar in Angul district of Orissa. Waste coal from the washery is proposed to be used as fuel for a 1,350MW power station. [14] (See Kishore Nagar Coal-to-Liquids Project for more details).
Estimated number of new plants approved
According to the Sierra Club, India approved 173 coal fired power plants in 2010.[16]
According to Economic and Political Weekly, if you count only projects that have a capacity of 500 MW or above, data from the Ministry of Environment and Forests (MoEF) indicates that since 2006, environmental clearance has been given to nearly 200 thermal coal projects for generating close to 220,000 MW of power: "To put this number in perspective, the total existing electricity generation capacity in the country – from thermal, nuclear, hydro, and other sources – was just over 176,990 MW at the end of June 2011 (CEA 2011). The thermal generation capacity expansion underway works out to 1.3 times the total generation capacity in the country." The top six coal-mining states – Jharkhand, Orissa, Chhattisgarh, West Bengal, Madhya Pradesh (MP), and Andhra Pradesh (AP) – account for close to half of the capacity addition. Tamil Nadu, Maharashtra and Gujarat account for a third. The remaining is spread across Uttar Pradesh (UP), Bihar, Haryana, Rajasthan, Karnataka, Punjab, Delhi and Tripura.[17]
According to an August 2011 report by Prayas Energy -- a non-governmental, non-profit organisation based in Pune -- the India Ministry has so far given environmental clearances to coal and gas-based power plants whose capacity totals 192,913 MW, while another 508,907 MW are at various stages in the environmental clearance cycle, for a total of 701,820 MW. Coal-based plants account for 84% of the projects. These additions are more than six times the currently installed thermal capacity of 113,000 MW.[18]
Andhra Pradesh, India
As of 2011, the installed capacity in the state of Andhra Pradesh is 15,800 MW. According to a survey by the Central Electricity Authority, the peak electrical demand in the state is expected to reach 28,215 MW by 2021. According to Grist, there are 117 proposed power plants in the state, geared to generate an additional 77,800 MW; of this, 55,925 MW will be coal-based.[19] According to the Guardian, seven major and more than 30 smaller coal-powered power stations are planned, together intended to have a capacity of 56GW.[20]
There has been community resistance against coal plants in Andhra Pradesh, particularly in the Srikakulam District, where six coal plants are proposed including the Nagarjuna Construction Company Sompeta Thermal Plant, and the Krishnapatnam port, where 24 plants are proposed. Police are reported to be unleashing violence and intimidation to suppress villagers as they struggle to protect their livelihood and habitats.[21]
The Nagarjuna Construction Company Sompeta Thermal Plant is a 2640 MW coal-fired power plant proposed for Sompeta in Andhra Pradesh, India. In the wake of highly publicized protests and the killings of local residents by police, the project's environmental clearance was revoked by the ministry of environment and forests in July, 2010.[22]
The Bhavanapadu Thermal Power Project is a 2,640 megawatt (MW) coal-fired power station proposed by East Coast Energy to be constructed in Andhra Pradesh, India.[23]
Environment Minister approves sixteen coal projects
On February 11, 2011 India's Environment Minister Jairam Ramesh approved a total of sixteen new coal projects that were on hold due to environmental regulations. Coal Minister Sriprakash Jaiswal stated that the environment minister’s okay of Coal India's proposed coal mine projects was due to pressure from higher levels in the Indian government. The Coal Minister also stated that environmental regulations are one of the reasons why the growth of Coal India – which produces 80 percent of the country's coal – dropped to 2 percent in 2010, compared to 2009's figure of almost 7 percent. However, the Coal Minister said the areas off limits to coal mining would remain off limits, despite the likely increase in the country's coal use.[24]
DB Power's proposed Dharamjaigarh coal mine and plant
DB Power is a subsidiary of DB Corp Ltd, a media conglomerate in India. DB Power is seeking the acquisition of 693.32 hectares of land for a coal mine, a project in Dharamjaigarh that would displace an estimated 524 families from six settlements to extract 2 million tonnes of coal annually. The coal would be used to fuel a 1320 MW thermal power plant that would be built in the adjoining district of Janjgir. After public protest against the proposed mine, DB Power submitted an affidavit pledging not to conduct any mining operations in nagar panchayat land. A supplementary letter filed at a Feb. 2011 public hearing promised to re-site any proposed water tanks and coal piles from nagar panchayat land to the remaining leased area. Four villages, however, would still lose their lands.[25]
The shortage of coal, rising coal prices, and the effect on proposed plants
Forty-two gigawatts of planned capacity has been mothballed as of Jan. 2012, due to coal supply bottlenecks and price curbs. Utilities won rights to build plants by bidding prices at which they would sell electricity. The utilities that have put additional coal capacity on hold had bid to sell electricity at an average of 2.5 rupees (5 cents) a kilowatt-hour, while current fuel prices put the cost of producing power at about 3 rupees a kilowatt-hour, slowing the growth of coal plants.[26]
The coal crisis has made financiers such as Infrastructure Development Finance Company (IDFC) wary of coal projects. In December 2011, IDFC managing director and CEO Rajiv Lall told The Times of India that IDFC was halting its financing of new coal-fired power plants. In an interview, Lall said,
- "The biggest problem is in the power sector due to (un) availability of fuel, notably coal, and due to continuing challenges of the state electricity boards (SEBs). Coal India never really believed that we can add 50,000 mw capacity addition in the plan period. It was unprepared to meet the extra demand. It is also true that they have had challenges in terms of developing new mining assets because of the environment debate. Thousands of crores ave been invested in generating plants that are about to come on stream and will not have enough coal to allow them to function at their optimal capacity. This has all kinds of potential knock-on effect. As cash generation will decline, debt servicing capacity shrinks, banks will have to either restructure loans or they will have less capital to fund growth. As banks become nervous on funding such projects, they are not financing to build more capacities. Problems in land acquisition and environment have led to most entrepreneurs losing risk appetite. Public sector banks are not lending to SEBs. The structural problems can't be brushed under the carpet and tariffs have to be raised, which some states have done. We don't have any exposure to SEBs. We have ring-fenced our exposure to coal-fire projects very well. But if SEBs start defaulting, then we can't help it. We are basically not lending to new coal-fired projects... We will not get back to thermal until a couple of these issues are solved."[27]
Coal Exports
India has almost negligible coal exports, estimated to be at only 1.5 million tonnes in 2005.[28]
Coal Imports
Note: 1 metric ton (tonne) = 1.10231 short tons
Country | 2006 | 2007 | 2008 | 2009 | 2010 |
---|---|---|---|---|---|
India | 52.7 | 29.6 | 70.9 | 76.7 | 101.6 |
(*Estimates are from the U.S. Energy Information Administration's International Energy Statistics.)
In 2009, India imported 67 mega tons (Mt) of coal, according to estimates by the World Coal Institute.[30] According to the U.S. EIA, in 2009 India mined 613.4 million, imported 77 million, and used 680.9 million short tons of coal.[31]
According to India Coal Market Watch, from April 2008 through March 2009, the country imported 59 million metric tons (tonnes); from April 2009 through March 2010 imports rose 24 percent to 73.25 million tonnes.[32] India’s coal imports rose by 14 percent from 2009, to 86.28 million metric tons in 2010.[33]
In 2011, coal imports rose an estimated 7.6% from 2010 to 118.4 million metric tons.[34][35][36]
Terminals
India is dependent on a number of coal terminals to bring these imports into the country. (See map at bottom of page.)
India coal ports
Terminal | State/Province | Operator | Annual Capacity (MM Tonnes) |
---|---|---|---|
Bedi Port | Gujarat | ||
Cochin Port | Kerala | 0.3 | |
Dahanu Port | Maharashtra | ||
Dahej Port | Gujarat | ||
Dharamtar Port | Maharashtra | ||
Ennore Port | Tamil Nadu | ||
Gangavaram Port | Andhra Pradesh | Gangavaram Port Ltd. | 10 |
Haji Bunder Port (MBFL) | Maharashtra | Mumbai Port Trust | |
Haldia Port | West Bengal | ||
Nhava Sheva Port | Maharashtra | Jawaharlal Nehru Port Trust | |
Kakinada Port | Andhra Pradesh | ||
Kandla Port | Gujarat | ||
Karaikal Port | Puducherry | ||
Krishnapatnam Port | Andhra Pradesh | ||
Magadalla Port | Gujarat | ||
Mormugao Port | Goa | 6.5 | |
Muldwarka Port | Gujarat | ||
Mundra Port | Gujarat | Adani Enterprises | 40 |
New Mangalore Port | Karnataka | ||
Okha Port | Gujarat | ||
Panjim (Panaji) Port | Goa | ||
Paradip Port | Orissa | 20 | |
Pipavev Port | Gujarat | APM Terminals | |
Porbandar Port | Gujarat | ||
Port of Chennai | Tamil Nadu | 15 | |
Sikka Port | Gujarat | ||
Tuticorin Port | Tamil Nadu | 10 | |
Visakhapatnam Port | Andhra Pradesh |
Future imports
Tata Power, a Tata group company, is looking for a strategic stake in Indonesian and South African coal mines for supply of 6-8 million tons of coal to fuel its 2x800MW thermal power project, the Mundra Ultra Mega Power Project. The company targets to acquire a stake that will assure 8-9 million tons of coal supply.[37] Tata Power is also seeking out coal from East Kalimantan and Mozambique.[38]
Coal India (CIL) plans to forge new deals with a mix of domestic and foreign companies. The latter includes BHP Billiton, Rio Tinto, and Vale of Brazil, as well as Vedanta Resources, a London-based metals producer that has embarked on a US$10 billion expansion of Indian coal mining to also increase its output of zinc, lead, and silver, and to power its expanding Jharsuguda aluminum smelter in Orissa. The Coal Ministry in early 2010 announced it was "encouraging" CIL to acquire or develop coal mining operations in Mozambique, Australia, Indonesia, South Africa and the US. The state company is also negotiating with Peabody Energy for stakes in four Australian mines, aimed at producing12 mt per annum by 2012.[38]
On August 2, 2010, news reports said India's Adani Group will buy a coal tenement in Queensland's Galilee Basis from Australia's Linc Energy. The deal could be worth more than 1 billion Australian dollars (900 million US), and would be the first time an Indian company has bought a coal seam rather than invested in a coal mining company. Adani is India's largest coal importer and a key player in India's plans to double power generation over the coming decade: there are 28 coal-fired plants under construction and another 28 on the drawing board. The value of shares in Linc has risen nearly 60 per cent since the start of July in anticipation of the sale of three Queensland coal assets. Linc's primary business is coal seam gas.[39]
It was announced in November 2011 that Coal India was in talks with Peabody Energy and Massey Energy about acquiring two of the companies' mines. Coal India has budgeted $1.2 billion to buy assets in the U.S., Indonesia and Australia during the year ending March 2011 as it battles a widening gap between domestic coal supply and demand.[40]
In early January 2011, MMTC, India's largest state-run trading company, announced that India was going to increase its coal imports from South Africa. Indian demand for South Africa’s coal contributed to Asia overtaking Europe in 2009 as the largest shipping destination for the fuel used in power plants.[41]
NTPC, India's largest state-owned energy provider, is "exploring" bilateral pacts with African nations to increase coal imports. Mozambique currently has such an arrangement with India.[42] The first shipment of 37,600 metric tons of coal was made January 18, 2012 by Vale, a private Brazilian based company.[43]
Peabody Energy Corporation reports that it will "rely on" demand for coal in India, among others, as demand in the United States decreases.[44]
In January 2012, Russia's Energy Minister Sergey Shmatko said the country will double its coal exports to Asia by 2030.[45]
BP's Energy Report details new projections that India will burn more coal than China by 2030. The report notes a plateau in Chinese coal demand following a stabilizing industrial system that will push India into the top spot.[46]
In July 2012 it was reported that India will need to import 185 million tons of coal annually by 2017 to the country's growing shortfalls. A draft paper by the government's commission on energy warned of "an urgent need to take effective measures to step up coal production".[47]
Indian company buys stake in Australian coal port
In April 2011, Indian company Adani Enterprises, the country’s largest coal importer, agreed to buy Australia's Abbot Point Coal Terminal for A$1.83bn ($1.98bn).
The purchase was among a number placed by Indian groups in Australia and elsewhere as the country to secure energy resources to meet rising demand for power to complete infrastructure projects in India.[48]
Funding and Programs for Clean Energy and Climate Change
India Rejects Calls to Reduce Greenhouse Gas Emissions
In June 2009, Environment Minister Jairam Ramesh said that India will reject any international treaty to reduce greenhouse gas emissions. Ramesh said that the effort to cut global warming emissions should instead be undertaken by industrialized countries. Ramesh said India has pledged to contain per capita CO2 emissions below those of developed nations, but said, "There is no way India is going to accept any emission reduction target, period, between now and the Copenhagen meeting and thereafter."[49]
India carbon tax
On July 1, 2010, India imposed a carbon tax on coal producers, and expects to raise $535 million, the first step by Asia’s third-largest energy consumer to charge companies for fossil fuel pollution. Coal, used to fire more than half of India’s electricity generation, will be taxed at 50 rupees a metric ton to help fund clean-energy projects. Coal producers nationwide will be charged the tax starting July 1, 2010, the Central Board of Excise and Customs said in a notice on its website after the levy was proposed in the federal government budget in February. The clean-energy levy will also apply to imported coal, Finance Minister Pranab Mukherjee said in his budget speech. Coal emits more carbon dioxide per unit of energy than other fossil fuels, according to the U.S. Energy Information Administration.[50]
India and climate change mitigation
In August 2010, the Indian government announced it was sanctioning $6.4 billion to finance efforts to mitigate the impacts of climate change on the environmentally sensitive and populous areas of the country. The funds will be used to achieve the targets and goals mentioned in the National Action Plan on Climate Change released by the Prime Minister's Council on Climate Change in 2008. The plan of action to mitigate the impacts of climate change have been subdivided into eight broad categories covering the most critical areas: energy efficiency, solar energy, sustainable agriculture, water conservation, sustaining the Himalayan ecosystem, and building a knowledge base for understanding climate change and its impacts better.[38]
India and renewable energy
In May of 2011 it was reported that India plans to invest $37 billion to create 17,000 MW of renewable energy generation by 2017, the Ministry for New & Renewable Energy said in a statement. The projected investment would come primarily from the private sector.
The current operating renewable energy capacity in India is 20,000 MW, which accounts for 11% of the total power capacity in the country. The major share of power as of 2011 comes from coal which accounts for 40% of the country’s energy usage.
The Indian government had quadrupled its renewable energy targets earlier in 2011 as part of its national plan to reduce carbon intensity which aimed at installing 74.4 GW of renewable energy capacity by 2022 and reduction in carbon emissions intensity by 20-25% of 2005 levels over the next ten years.[51]
In February 2012, India's largest state-run lender to electricity utilities, Power Finance Corporation, announced it will increase lending to wind and solar plants from 1.2% to 4% of its total lending budget. Chairman Satnam Singh cited the volatility of coal prices as a factor in the decision. Praveen Kadle, managing director for Tata Capital Ltd., says escalating investment risk in coal plants has movitaved some investors to take their money elsewhere.[52]
Reports
Health costs of coal
The 2013 study "Coal Kills: An assessment of death and disease caused by India's dirtiest energy source," conducted by the NGOs Conservation Action Trust (CAT), Urban Emissions, and Greenpeace looked at emissions data of 111 coal-fired power plants (generation capacity of 121GW) and found that in 2011-2012:
- emissions from Indian coal plants resulted in 80,000 to 115,000 premature deaths and more than 20 million asthma cases from exposure to total PM10 pollution; and
- the monetary cost associated with the health impacts of coal exceed Rs.16,000 to 23,000 crores (USD $3.3 to 4.6 billion) per year.
NASA calculates that sulfur dioxide emissions from power plants in India increased by more than 60 percent between 2005 and 2012, based on satellite data.
New coal plants
According to the 2011 report "Thermal Power Plants on The Anvil : Implications And Need For Rationalisation" by Prayas (Initiatives in Health, Energy, Learning and Parenthood) -- a non-governmental, non-profit organisation based in Pune -- the India Ministry has given environmental clearances to coal and gas-based power plants whose capacity totals 192,913 MW, while another 508,907 MW are at various stages in the environmental clearance cycle, for a total of 701,820 MW. Coal-based plants account for 84% of the projects. These additions are more than six times the currently installed thermal capacity of 113,000 MW.
Many of the projects in pipeline will be geographically concentrated in a few areas: 30 districts (4.7% of the total 626 districts in India) will have more than half of the proposed plants, with their capacity adding up to about 380,000MW. Fifteen districts each have plants with capacities totaling 10,000 MW or more. Districts Janjgir-Champa and Raigarh in Chhatisgadh have the highest concentration of proposed plants in the country, with 30,470 MW and 24,380 MW planned, followed by Nellore in AP with 22,700 MW. The districts of Rewa (17,820 MW), Singrauli (15,240 MW), Sonbhadra (7,638 MW), Sidhi (5,240 MW, not in the top 30) and Allahabad (5,280 MW, not in top 30) are adjoining, and add up to a proposed capacity of 51,218 MW.
The private sector accounts for 73% of all projects, with 10 private corporate groups planning to build about 160,000 MW.
The report argues that: "These projects in pipeline represent a massive overcapacity in the making. Thus, valuable and scarce natural resources of land, water, gas and coal will be allocated to projects that are not required. Crucially, land for such TPPs [thermal power plants] is invariably acquired compulsorily by governments by using the Land Acquisition Act (LAA), which allows forcible acquisition for a public purpose. Given that the thermal capacity in pipeline is far in excess of that required, it is clear that many of these plants will not serve a public purpose. Hence, the use of the LAA to acquire land for such TPPs cannot be justified.
"...The report therefore recommends an immediate moratorium on any further environmental clearance to new power plants. Further, it also recommends that from the 200,000 MW that have already been given environmental clearance, projects with very high social and environmental impacts, projects that do not have broad local acceptance, and projects leading to sub-optimal use of transmission, fuel, land and water should be put on hold. It also calls for simultaneously initiating a fully transparent deliberative process to (a) completely revamp the environmental clearance procedures of power plants, so as to minimise social and environmental impacts of power projects, and mandate prior regional carrying capacity studies to decide on the extent of projects in an area, (b) to ensure a coordinated approach of different agencies for optimising fuel, land and water allocations for different projects and (c) to reassess the long term demand for power and measures to meet this demand in an optimal manner, including energy efficiency as well as renewable energy, so as to improve energy security and minimise the social and environmental damage due to power sector development."[53]
Citizen Action
Arrest of indigenous rights activists
On May 28, 2011, two indigenous rights activists, Ramesh Agrawal and Dr Harihar Patel, were arrested in the central Indian state of Chhattisgarh and denied release on bail.
The state police charged the two men with “circulating defamatory material”, “disrupting public order” and “causing alarm and panic among the public” at a May 8, 2010 mandatory public consultation, held by the state pollution board at Tamnar village, relating to the proposed expansion of a coal-fired plant run by Jindal Steel and Power.
Agrawal and Patel expressed concerns that the expansion would lead to the forcible acquisition of lands from the surrounding local communities by the authorities. The two activists had objected to the proposal and cited an official inspection report which stated that the expansion began before the mandatory clearances were given. Ramesh Agrawal also successfully petitioned India’s Ministry of Environment and Forests to temporarily suspend the terms of reference for the expansion. Following a complaint relating to the delay, the state authorities decided to arrest the two activists.
Ramesh Agrawal works for the environmental rights organization Jan Chetna, and Dr Harihar Patel practices indigenous medicine. They had been actively campaigning against the pollution caused by existing industrial projects, including coal plants, and the potential negative environmental impact of proposed industrial projects in central Chhattisgarh. The two activists have been at the forefront of the campaign for the public disclosure of information relating to projects which affect local Adivasi (Indigenous) communities and for ensuring that these are available to the communities. Their arrest, Amnesty International believes, is intended to stop their peaceful campaign activities.
The two activists were sent to Raigarh prison until June 3, 2011, and a local court rejected their appeals for release on bail on June 2. Ramesh Agrawal, who complained of hypertension, was taken for treatment at a government-run hospital where he is being kept chained to his bed.[54]
World Bank financing
In October 2010 Green groups criticized the U.S. Export-Import Bank (Ex-Im Bank) for its expected final approval of hundreds of millions of dollars in subsidized federal financing for the 4,000 megawatts (MW) Sasan coal power plant and mine in India.
The groups also accused the Bank of falsely linking renegotiation of the coal financing to a renewable energy project.
“Ex-Im Bank flip flopped on this massive climate-damaging project--and belly flopped on the first major test of the agency’s carbon policy,” said Michelle Chan, director of the economic policy program at Friends of the Earth.[55]
Community impacts and resistance
The United Nations estimates that more than 25 percent of India’s 1.2 billion people live without electricity. Yet many communities protest new coal mines and plants because it displaces them from their land, and they do not receive the electricity generated.[56]
August 2007: 6,000 people face displacement in Madhya Pradesh
Five villages -- Sidhikhurg, Sidhikala, Tiyara, Jhanjhi, and Harrhawa -- covering approximately 3,000 acres and with a population of 10,000 people are slated for displacement by the Sasan Ultra Mega Power Project in the far western corner of Madhya Pradesh, a state located in central India. The project will use caol from coal mines located 20 to 25 kilometers away, in Mohar, Amlori, and Chatrasal. The project is sponsored by Reliance Power.[57]
July 2010: Two killed, 150 injured in Andhra Pradesh
On July 14, 2010, police in Adhra Pradesh's Srikakulam district fired on farmers and fisherman protesting a 2,640 MW coal plant under construction by Nagarjuna Construction Company (NCC), killing two. In addition, 150 people were injured, including 45 policemen, during clashes between protesters and police. In the wake of the violence, police were deployed in about a dozen villages and banned assembly by more than five persons.[58]
January 2010: Hanakon thermal project shelved after intense protest; protesters tortured
On July 18, 2009, thousands rallied in Karwar to protest the proposed Hanakon thermal station. The rally began at the Maladevi ground, and was followed by a meeting at Savitha circle. A series of speakers denounced the project as a threat to a biologically sensitive region, and criticized the company's suppression of protest. The protest passed the office of Ind Bharat Company, sponsor of the project. Protesters allegedly pelted the offices with stones, then attempted to block the national highway. A coalition of 24 groups submitted a joint memorandum opposing the project.[59] Following a call for a bandh, or general strike, in response to police violence against protesters in Hanakon village, schools and colleges closed in August 2009. The bandh was also observed by shopkeepers of Nandanagadda area of Karwar. Students from multiple colleges marched to primary and high schools in Karwar, closing in each school.[60] The project was shelved in January 2010.[61][62] According to S R Nayak, chairman of the State Human Rights Commission, police tortured agitators in custody. During a hearing sponsored by the Commission, 40 people testified, including 28 victims of torture at the hands of police.[63]
January 2011: 25 people injured in Chhattisgarh protests
On January 17, 2011, at least 25 people were injured and over a hundred were taken into custody during protests by farmers against land acquisition by KSK Energy Ventures Limited, sponsors of the 3,600 MW KSK Mahanadi Power Project at Nariyara village in the Akaltara district of Chhattisgarh, about 170 km from the state capital Raipur. At issue in the protests is the prime quality of the agricultural land being made available for an estimated 40,000 MW of power plants planned for the Janjgir-Champa district. State Congress president Dhanendra Sahu told reporters, "It's a foolish decision, Janjgir-Champa has highly productive farm land and also has access to irrigation facilities. This is a conspiracy by the state government to hand over farmers' prime land to industries."[64]
February 2011: Two killed, 25 injured in Andhra Pradesh
On February 28, 2011, in a set of clashes sparked by construction of the Bhavanapadu Thermal Power Project by East Coast Energy, police in Srikakulam fired into villagers, killing two people and injuring nearly 25 others. The plant at the center of the violence was in the same district as the coal plant where two people were killed the previous July 2010, protesting the Nagarjuna Construction Company Sompeta Thermal Plant. The dead were identified as Sirapu Yerraiah (36) of Sirapuvani Peta and J. Nageswara Rao (35) of Akashalakkavaram. At least two of the injured were hit at close range with rubber bullets. Police used guns, teargas, and lathis against villagers, who used stones and sticks. After police threw smoke bombs in Vadditandra village, 50 houses were gutted. A police jeep was burned by villagers.[65]
April 2011: Four killed in protests against anti-encroachment drive in Jharkand
The state of Jharkhand is home to one of the largest Adivasi (tribal) populations in India. It is also the location of an estimated 40% of the country’s deposits of coal, iron ore, uranium and other minerals. Jharkhand’s Adivasis have farmed and hunted on the land for millennia, but do not hold title deeds, but as the original inhabitants of the Indian subcontinent, Adivasis have ancient land rights protected by law. They are, however, being forced to leave their ancestral lands to make way for new mines, steel mills and hydroelectric projects, with little or no compensation.[66]
Following resistance by local residence against house demolitions at Matkoria, four people were killed in clashes with police attempting to clear land owned by Bharat Coking Coal Limited. In addition, 21 people were injured and 27 arrested. Among the arrested were former ministers Bacha Singh and OP lal, Congress MLA Manan Mallick, and deputy mayor Niraj Singh. A curfew was imposed on Dhanbad town.[67] Among those killed in the fighting was Vikash Kuman, an auto driver.[67] Another fatality was that of Sanjay Paswan.[68]The protesters blocked National Highway 32 between Dhanbad and Bokaro for several hours. Police used lathis and teargas to disperse protesters. A Mob set fire to offices of Bharat Coking Coal Limited at Kunsunda and Godhar. Protesters also set on fire a police check post in Matkuriya as well as three police vehicles. Nine people were reported in critical condition with bullet wounds. Among the injured were a half dozen members of the media, including four camera men. Most of those being subjected to the anti-encroachment drive had settled in the area 80 years earlier.[69]
May 2011: Mango farmers protest coal plants in Maharashtra's Ratnagiri district
Farmers marched to protest coal plants in Ratnagiri district of Maharashtra, in an area known as the Konkan Coast. The protests were organized by the Ratnagiri Zilla Jagruk Manch, an organization leading a campaign against seven thermal power plants proposed for the district. In Pawas, Ratnagiri district, villagers protested with a hunger strike.[70][71]
In July 2011, JSW Energy - an Indian power producer controlled by the billionaire Jindal family - delayed expansion of a 3,200 MW coal plant in Ratnagiri as it waits for coal-pricing “clarity” from Indonesia and Australia.[72]
On June 2, 2011, a 15-member motorbike gang shot dead a realtor and two others at the Asansol courthouse in India, which the police said was likely a rivalry between coal mafias. Councillor Rohit Nunia from Kulti, a town 30km from Asansol whose municipality is run by a Trinamul-Congress alliance, is believed by police to be involved in coal smuggling and seeking revenge for an attempt on his life in December 2010, although a Left Front leader claimed the coal connection crosses political parties.
The 15 youths appeared suddenly, called realtor Ram Lakshman Yadav's name, and began shooting. Within seconds, the realtor, a guard, and Mukesh Singh, had slumped to the ground while the gang chased Kamalesh Singh to the basement. Mukesh was sent to a hospital in Durgapur while the other three were declared dead on arrival at an Asansol hospital. Yadav had been riddled with 10 bullets, sources said, and the other two slain men too had multiple wounds.
Jagmohan, the deputy inspector-general, said the slain realtor had two cases pending against him, one for possession of illegal arms in 1994 and the other for a murder attempt in 1999. Another officer said three suspects had been detained, including CPI councillor Nunia: “An attempt was made on Nunia’s life six months ago but he escaped unhurt. He was involved in smuggling coal out of the IISCO factory."[73]
September 2011: Moving Planet day of action
On September 24, an Indian delegation and US mountaintop removal activists will take part in "Moving Planet" day in support of fossil fuel-alternative energy, in West Virginia and India. The India delegation is calling on the World Bank to follow through with its proposal to dramatically cut funding for coal-burning power stations.[74]
September 2011: Greenpeace calls for moratorium on new coal projects in Singrauli
After releasing the 2011 report, "Singrauli: The Coal Curse," Greenpeace called for a moratorium on new coal mining activities in the Singrauli region, based on the findings of a Greenpeace team in the region that the projects "deprive the livelihood of displaced people and ruin their health." According to Priya Pillai, the communities are living in an atmosphere which is full of coal dust: "The people gave up their land for power that doesn't reach them."
In Singrauli, the Mahan, Chhatrasal, Amelia and Dongri Tal II forest blocks, which were earlier categorised as 'no go', are awaiting approval for coal mining from the government. Officially, 5,872.18 hectares of forest in the Singrauli region had been marked for non-forest use after the Forest Conservation Act came into force in 1980. According to the divisional forest officer of Singrauli, another 3,229 hectares have been proposed for such activities.
Singrauli is all set to become the country's "power capital" with a number of power plants coming up in Madhya Pradesh, apart from the nine open cast coal mines which are going to start production by 2014. The combined investment of all these projects is estimated to be over Rs 1 lakh crore.
November 2011: Activist nun who fought Indian mining companies brutally murdered
In mid-November 2011 Sister Valsa John, an anti-coal activist in India, was killed in her village of Pachwara, a small community in the eastern Indian state of Jharkhand. She was allegedly killed by individuals hired by coal mining companies. The individuals beat and hacked her to death. Sister Valsa was 52 and took her vows was a member of Sisters of Charity of Jesus and Mary. It was reported that on numerous occasions she had gone to the police after threats where made on her life. The following was written in the Globe and Mail following her death:
- She was one of the remarkable breed of Indian religious figures who are grassroots social activists, who immerse themselves in the most marginalized and impoverished communities and work on literacy, basic health care and human rights. Sister Valsa said she did Jesus’s work by teaching the aboriginal people – known in India as adivasi or “tribals” – about their rights to their land.[75]
On November 20, 2011 seven residents of Pachwara and adjoining Aloopara village, were arrested for the killing of Sister Valsa John. The Sister's family in the India region of Kerala had alleged she faced death threats from the "mining mafia" in the area and was killed because of her campaign against the Panam Coal Company. However, police alleged that that locals were responsible for her death instead.[76]
Prior to being killed, Sister Valsa John stood up for a rape victim in her community and a police report filed for the case. The alleged rapist, arrested days after the murder and later charged with that too, reportedly told the police that Sister Valsa was “an agent” of a private coalmine company.[77]
Carbon credits
As of 2011, India has become the world's second largest source of carbon credits, or Certified Emission Reductions (CERs), and has attracted foreign companies who trade them to the West. To qualify for saleable credits, companies in "developing" countries must demonstrate their emission reductions go beyond their "business as usual" plans. But according to July 2008 American diplomatic cables released by Wikileaks, most credits certified in India are questionable and do not meet international standards. The cable, written by staff at the United States Consulate in Mumbai, quote a senior Indian carbon credit assessor admitting no projects in India meet the international benchmark. R K Sethi, head of India's Clean Development Mechanism Authority, admitted his colleagues simply take "the project developer at his word" when they approve carbon credit applications. Eva Filzmoser of CDM Watch, which campaigns for a more rigorous carbon credit system, said the cable effectively dismissed Indian schemes as "a source of extra revenue for projects that would have happened anyway." Thirty-three coal power plants were among 1700 carbon credit project bids in India, and four of the power stations are among 700 projects approved to date.[78]
A 2011 Stockholm Environment Institute report found that project documents for Indian Clean Development Mechanism projects "inflate the benefits of switching from subcritical to supercritical technology. Specifications of technologies currently available in the market suggest the relative efficiency and emissions improvements are likely to be on the order of 2 to 4%. In contrast, these coal projects are claiming improvements on the order of at least 11%, on average."[79]
Coal India to use GPS to stop pilferage
It was announced in November 2011 that Coal India would use satellite technology to prevent shipments from being hijacked amid a shortage that has hit supplies to thermal power projects in the country. It is estimated that at least a quarter of 431 million tonnes of coal was stolen in transit.[80]
Citizens Groups Tracking Coal Power and Mining in India
- Conservation Action Trust
- Environmental Protection Group, Orissa
- India Youth Climate Network
- Jharkhand Mines Area Coordination Committee
- Kalpavriksh Environment Action Group
- Kuntala Lahiri Dutta Australia
- Mines, Minerals and People
- Samata
Government Agencies
Notes
- ↑ All India Installed Capacity in (MW) of Power Station as on 30-06-2016. Central Electricity authority, GoI. Retrieved on 11 July 2016.
- ↑ "Coal Reserves," India Ministry of Coal, accessed July 2016
- ↑ "Growth of installed capacity since 6th Plan," Central Electricity Authority, accessed June 2012
- ↑ The figure for current capacity as of May 31, 2012 comes from Table 2, "Summary statistics for proposed coal plants in India," which is derived from the complete table shown in Proposed coal plants in India
- ↑ "Thermal Power Plants on the Anvil," Prayas Energy Group, August 2011.
- ↑ For plant-by-plant information, see Proposed coal plants in India.
- ↑ "Ultra Mega Power Projects," Ministry of Power, accessed July 2012
- ↑ Amiti Sen & Subhash Narayan, "States make case for second UMPP with advanced land clearances", Economic Times, (India), March 20, 2010.
- ↑ Ultra Mega Power Projects, Ministry of Power Government of India, undated but approx October 2007.
- ↑ "Coal Fired Plants Financed by International Public Investment Institutions since 1994", Appendix A in Foreclosing the Future: Coal, Climate and International Public Finance: Investment in coal-fired power plants hinders the fight against global warming, Environmental Defense, April 2009.
- ↑ Jump up to: 11.0 11.1 Inventory of Coal Resources of India - Ministry of Coal.
- ↑ Coal & Lignite - Indian Minerals year book - 2011. Indian Bureau of Mines, Government of India (October 2012). Retrieved on 22 August 2013.
- ↑ "Sasol-Tata Steel JV aims to produce 80,000 bpd by 2018", Business Standard, June 02, 2010.
- ↑ Jump up to: 14.0 14.1 "Tatas, Jindals win coal-to-oil crowns", The Telegraph, March 3, 2009.
- ↑ "Tata Steel-Sasol to set up CTL plant in Orissa", Business Standard, January 18, 2010.
- ↑ Justin Guay, "Responding to the Energy Crisis in India: The National Energy Conclave" Sierra Club Compass, April 11, 2011.
- ↑ Kannan Kasturi, "New Thermal Power Clusters" Economic and Political Weekly, Oct. 1, 2011.
- ↑ "Thermal Power Plants on the Anvil," Prayas Energy Group, August 2011
- ↑ Mary Ann Hitt and Justin Guay, "The Struggle Against India’s Coal Rush" Grist, July 2, 2011.
- ↑ John Vidal, "Andhra Pradesh at the forefront of Indian 'coal rush'" Guardian, July 14, 2011.
- ↑ Kunal Majumder, "Yes, let there be light. But no pain" Tehelka, May 7, 2011.
- ↑ Trushna Udgirkar, "Nagarjuna Construction may relocate Andhra power project," The Economic Times, September 10, 2010
- ↑ B Krishna Prasad, "Bevy of retired power officials linked to East Coast Energy," The Times of India, March 15, 2011
- ↑ "Coal Minister speaks on Jairam's green nod to 16 coal projects" NDTV.com, February, 15, 2011.
- ↑ Aman Sethi, "Stiff resistance to DB Power coalmine in Chhattisgarh" The Hindu, March 1, 2011.
- ↑ Kartikay Mehrotra and Rakteem Katakey, "India’s Rich Halt Power Plans in Setback to Prosperity: Energy" Bloomberg, Jan. 18, 2012.
- ↑ "No loans to thermal power projects," Times of India, December 21, 2011
- ↑ Cite error: Invalid
<ref>
tag; no text was provided for refs namedWCI
- ↑ International Energy Annual Statistics, EIA, accessed January 2012
- ↑ "Coal Statistics" World Coal Institute, accessed January 2011.
- ↑ "India: Quick Facts" EIA, August 2010.
- ↑ "India's 2011/12 coal imports to jump 70 pct - minister," Reuters, February 3, 2011
- ↑ Dinakar Sethuraman, "India’s Coal Imports Rose by 14 Percent in 2010, ICMW Says" Bloomberg, Jan. 11, 2011.
- ↑ "India Coal Imports Rose Estimated 7.6% in 2011, India Coal Says" Bloomberg, January 12, 2012.
- ↑ http://www.thehindu.com/business/Industry/article3006175.ece "More coal imports likely following duty reduction"] The Hindu, March 17, 2012.
- ↑ "Coal India May Import Up to 30 Million Tons This Year" Saurabh Chaturvedi, Wall Street Journal, June 11, 2012.
- ↑ Karvy Global, "Coal-Starved India Could Spur Acquisitions" The Street, August 4, 2010.
- ↑ Jump up to: 38.0 38.1 38.2 Mridul Chadha, "India Sets Aside $6.4 Billion to Fight Climate Change" ecopolitology, August 25, 2010.
- ↑ "India's Adani eyes Australia's coal reserves" EarthTimes, August 2, 2010.
- ↑ "Coal India in talks for Peabody, Massey mines" Erika Kinetz, Forbes.com, November 12, 2010.
- ↑ Carli Lourens, "India Plans to Boost South African Imports of Gold, Coal, Gems and Metals", Bloomberg, January 10, 2011.
- ↑ Saurabh Chaturvedi, "NTPC Looking at Africa Coal Block Opportunities", The Wall Street Journal, January 24, 2012.
- ↑ Fred Katerere, "Vale Makes First Mozambique Coal Transhipment to India, AIM Says", Bloomberg, January 18, 2012.
- ↑ Associated Press "Peabody says China, India will continue to replace declining US coal demand", The Washington Post, January 24, 2012.
- ↑ Ilya Arkhipov and Yuliya Fedorinova, "Russia Plans to More Than Double Coal Exports to Asia by 2030", Bloomberg, January 24, 2012.
- ↑ "India will burn more coal than China in 20 years," The Hindu Business Line, February 6, 2012
- ↑ "India to boost coal imports" UPI.com, July 17, 2012.
- ↑ "Adani buys Australian coal port for $1.98bn" Peter Smith & James Fontanella-Kahn, Financial Times, May 3, 2011.
- ↑ Bibhudatta Pradhan, "India Rejects Any Greenhouse-Gas Cuts Under New Climate Treaty," Bloomberg, July 2, 2009.
- ↑ Natalie Obiko Pearson, "India to Raise $535 Million From Carbon Tax on Coal" Bloomberg, July 1, 2010.
- ↑ "India Plans $37 billion investment to add 17,000 MW clean energy capacity by 2017" Mridul Chadha, May 13, 2011.
- ↑ Kartikay Mehrotra, "Renewable Energy’s Funding to Be Doubled by Indian State Lender," Bloomberg, February 6, 2012.
- ↑ Shripad Dharmadhikary and Shantanu Dixit, "Thermal Power Plants on The Anvil: Implications And Need For Rationalisation" Prayas Energy Group Report, August, 2011.
- ↑ "Indian environmental activists held" Amnesty International, June 2, 2011.
- ↑ "Green Groups Blast U.S. Financing for Massive Coal Project" SustainableBusiness.com.
- ↑ Kartikay Mehrotra and Rakteem Katakey, "India’s Rich Halt Power Plans in Setback to Prosperity: Energy" Bloomberg, Jan. 18, 2012.
- ↑ "6,000 people to lose land to Sasan project," Rediff India Abroad, August 27, 2007
- ↑ "Srikakulam still tense after police firing," The Siasat Daily, July 15, 2010
- ↑ "Protest held against Hanakon thermal project," The Times of India, July 20, 2009
- ↑ "Hanakon violence: Students take out rally against police atrocities," The Times of India, August 7, 2009
- ↑ "Hanakon thermal power plant project shelved," The Hindu, January 3, 2010
- ↑ "Another Nandigran?" Tehelka, November 21, 2009
- ↑ "40 persons testify before SHRC," The Times of india, August 11, 2009
- ↑ "Power plant protest turns violent, dozens injured," Indo Asian News Service, January 17, 2011
- ↑ K. Srinivasa Rao, "2 killed, 25 hurt in police firing in Kakarapalli," The Hindu, March 1, 2011
- ↑ "Jharkhand: A Disappearing World" Panos Pictures, accessed May 2011.
- ↑ Jump up to: 67.0 67.1 "Death toll clims to 4 in Jharkhand clash; curfew continues," Daily News & Analysis, April 28, 2011
- ↑ "Dhanbad clash toll four; curfew continues," The Hindu, April 29, 2011
- ↑ Law Kumar Mishra, "One killed, 17 injured in anti-encroachment protests," The Times of India, April 27, 2011
- ↑ "Fuelling dissent: Coal power plants," NDTV, May 1, 2011
- ↑ "Another Nandigran?" Tehelka, November 21, 2009
- ↑ Rajesh Kumar Singh, "Billionaire Jindal’s JSW Delays Power-Project Expansion on High Coal Costs" Bloomberg, July 22, 2011.
- ↑ [http://www.telegraphindia.com/1110603/jsp/frontpage/story_14065594.jsp "Mafia slayings in Asansol Bike gang guns down three"] The Telegraph, June 3 , 2011.
- ↑ Amanda Wilson, "Indian activists take fight against coal to World Bank" Asia Times, Sep. 22, 2011.
- ↑ "Activist nun who fought Indian mining companies brutally murdered" The Globe and Mail, Stephanie Nolen, November 18, 2011.
- ↑ "Seven arrested for nun's killing in Jharkhand" NDTV, November 20, 2011.
- ↑ "Hounded by those she had fought for" Manoj Prasad, Indian Express, November 21, 2011.
- ↑ Dean Nelson, "Polluting Indian firms awarded hundreds of millions in carbon credits" The Telegraph, Sep. 28, 2011.
- ↑ Michael Lazarus and Chelsea Chandler, Coal Power in the CDM: Issues and Options 2011 Stockholm Environment Institute Report, p.7.
- ↑ "Coal India to use GPS to stop pilferage" Ruchira Singh & Utpal Bhaskar, LiveMint.com, November 7, 2011.
Additional resources
Related SourceWatch articles
- Coalgate
- Proposed coal plants in India
- Tata Power
- Tata Ultra Mega
- India and nuclear power
- U.S.- India Civil Nuclear Cooperation Initiative
- Global use and production of coal
- Australia and coal
- Britain and coal
- China and coal
- Colombia and coal
- Germany and coal
- Indonesia and coal
- Japan and coal
- New Zealand and coal
- South Africa and coal
- Coal terminals
- United States and coal
External documentaries
- Orlando de Guzman, "India's coal rush: The country's dependence on coal is leaving a dirty trail of violence, landlessness and poverty", 101 East, Al Jazeera, March 23, 2012. (This is a 25 minute long documentary on problems with coal mining in the coal belt of Jharkhand and West Bengal.)
External Articles
- Sarah Stirk, "India's coal inferno," Ecologist, Jan 28, 2014.
- Rohit Chandra, "India’s Coal-ed Streak," The Center for the Advanced Study of India, Nov. 21, 2011.
- "Sierra Club India Trip" Sierra Club, April 12, 2011
- Jeff Biggers, "India's Coal Rush: Interview With Jharkhand Leader Bulu Imam" League of India, March 6, 2011
- "Jharkhand: A Disappearing World" Panos Pictures, accessed May 2011.
- Srinivas Krishnaswamy, "SHIFTING OF GOAL POSTS: Rural Electrification in India: A Progress Report," Vasudha Foundation, March, 2010
- Jason Miklian and Scott Carney, "Fire in the Hole: How India's economic rise turned an obscure communist revolt into a raging resource war," Foreign Policy, September / October 2010
- Abhay Singh and Pratik Parija, "Coal India Seeks Faster Approvals, Imports, Overseas Miners", Bloomberg, July 1, 2009.
- Ministry of Coal, "Coal Mining in India: The Past", Ministry of Coal website, accessed June 2008.
- Ministry of Coal, 2007-2008 Annual Report", Government of India Ministry of Coal. (Large Pdf)
- International Energy Agency, "Coal in India in 2005", International Energy Agency website, accessed June 2008.
- U.S. Geological Survey, India 1994-2006
- "India", World Coal Institute, undated, accessed June 2008.
- Country Profile: Focus on India", Ecoal, World Coal Institute, July 2006.
- Tony Herbert and Kuntala Lahiri-Dutt, "Coal Sector Loans and Displacement of Indigenous Populations: Lessons from Jharkhand" Economic and Political Weekly, June 5, 2004
- Natalie Obiko Pearson, "India's 'astonishing auction' pushes down global solar price," Blombergy, December 5, 2011
- "Smoke Screen: Ambient Air Quality in India," Community Environmental Monitoring, June 2006
- Salil Deshpande, "People power takes on thermal power," Daily News and Analysis, October 24, 2006
- K. Raja, "Complete information on the Production of coal in India," Preserve Articles, accessed February 7, 2012
- Markus Hyvonen and Sean Langcake, "India's Steel Industry", Bulletin, Reserve Bank of Australia, March Quarter 2012, pages 29-35.
External References
- "India: National Ambient Air Quality Standards," India Central Pollution Control Board, published 1984 and 1988.
- DETAILS OF COAL BLOCKS ALLOCATED AS ON 23.06.2011