Chachoengsao-Nonthaburi Gas Pipeline
Jump to navigation
Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy. |
Sub-articles: |
Chachoengsao-Nonthaburi Gas Pipeline is a proposed natural gas pipeline in Thailand. The pipeline is also known as the Fifth Transmission Project and Fifth Transmission Project - Phase 2, a name that has also been used to describe the Rayong to Nonthaburi Gas Pipeline.
Contents
Location
The proposed pipeline would run from Chachoengsao in Chachoengsao province to Nonthaburi in Nonthaburi province.
Project Details
- Operator: PTT
- Parent Company: PTT
- Current Capacity:
- Proposed Capacity:
- Length: 124 miles / 200 kilometers
- Status: Proposed
- Start Year: 2021
Background
In June 2018 PTT signed a contract for construction of the pipeline with JSC “OGCC KazStroyService” (KSS).[1]
Articles and resources
References
- ↑ PTT BUILDING CONTRACT SIGNED FOR PHASE 2 OF FIFTH PIPELINE, The Nation Thailand, Jun. 29, 2018