Ilo 2 power station is a 135-megawatt (MW) coal-fired power plant in Pacocha, Ilo, Peru.
Contents
Location
The undated satellite photo below shows the plant, which is near Pacocha, Ilo, Peru.
Background
The plant's original coal-fired, 135 MW Unit 1 went online in August 2000.[1] In June 2013 the plant's owner, Enersur, added three diesel-fueled cold reserve units at the Ilo facility, with a total capacity of 460 MW, expandable to 560 MW.[2] A proposed 135 MW coal-fired Unit 2 for the Ilo 2 plant was still listed in Platts' World Electric Power Plants Database as of June 2015[3] but appears to have been abandoned since it is not included in Enersur's plans or in recent coverage of Peruvian operations on the website of Enersur's parent company Engie.[4]
Planned Retirement
In December 2019 Engie announced that the plant would close by 2022.[5]
Project Details
- Sponsor: Enersur
- Parent company: Engie/GDF Suez
- Location: Pacocha, Ilo, Peru
- Coordinates: -17.7759701, -71.1892805 (exact)
- Status:
- Unit 1: Operating
- Unit 2: Cancelled
- Gross Capacity:
- Unit 1: 135 MW
- Unit 2: 135 MW
- Type: Subcritical
- Projected in service:
- Coal Type:
- Coal Source:
- Source of financing:
Articles and resources
References
- ↑ "C.T. Ilo 2 Power Plant,", Global Energy Observatory website, accessed April 2014.
- ↑ "Noticias 20 Jun 2013,", Enersur website, accessed February 2015.
- ↑ "World Electric Power Plants Database,", Platts, June 2015. The database is not available online but can be purchased from Platts.
- ↑ "Second energetic operator in Peru GDF SUEZ accelerate its growth in the country,", GDF Suez media release, April 26, 2013, accessed via Engie website, October 2015.
- ↑ ENGIE to Replace 1 GW of Coal Assets with 1 GW of Renewables, Steel Guru, Dec. 16, 2019