Category talk:Proposed coal plants in Africa
Jump to navigation
Jump to search
Loading map...
Notes | Unit | Plant | Other names | Developer | Parent | Capacity | Status | Year' | Coal | Type | Latitude | Longitude | Accuracy | City or Town | District or Province | Country |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
see http://bit.ly/NL4LvS and http://bit.ly/NL3F3b | CIC Coal to Hydrocarbons Project | CIC Coal to Hydrocarbons Project | CIC Energy | Jindal Group | Proposed | -23.609295 | 26.774952 | approximate (location of Mmamabula coal field) | Mmaphashalala | Central | Botswana | |||||
see http://bit.ly/NL1Hjt and http://bit.ly/NL3F3b | CIC Domestic Power Project | Domestic Power Project | CIC Energy | Jindal Group | 300 | Proposed | -23.609295 | 26.774952 | approximate (location of Mmamabula coal field) | Mmaphashalala | Central | Botswana | ||||
see http://bit.ly/NL1Hjt and http://bit.ly/NL3F3b | Mmamabula Energy Project Stage I, Unit 1 | Mmamabula Energy Project | CIC Energy | Jindal Group | 300 | On hold | -23.609295 | 26.774952 | approximate (location of Mmamabula coal field) | Mmaphashalala | Central | Botswana | ||||
see http://bit.ly/NL1Hjt and http://bit.ly/NL3F3b | Mmamabula Energy Project Stage I, Unit 2 | Mmamabula Energy Project | CIC Energy | Jindal Group | 300 | On hold | -23.609295 | 26.774952 | approximate (location of Mmamabula coal field) | Mmaphashalala | Central | Botswana | ||||
see http://bit.ly/NL1Hjt and http://bit.ly/NL3F3b | Mmamabula Energy Project Stage II, Unit 1 | Mmamabula Energy Project | CIC Energy | Jindal Group | 300 | On hold | -23.609295 | 26.774952 | approximate (location of Mmamabula coal field) | Mmaphashalala | Central | Botswana | ||||
see http://bit.ly/NL1Hjt and http://bit.ly/NL3F3b | Mmamabula Energy Project Stage II, Unit 2 | Mmamabula Energy Project | CIC Energy | Jindal Group | 300 | On hold | -23.609295 | 26.774952 | approximate (location of Mmamabula coal field) | Mmaphashalala | Central | Botswana | ||||
see http://bit.ly/NL1Hjt and http://bit.ly/NL3F3b | Mmamabula Energy Project Stage III, Unit 1 | Mmamabula Energy Project | CIC Energy | Jindal Group | 800 | On hold | -23.609295 | 26.774952 | approximate (location of Mmamabula coal field) | Mmaphashalala | Central | Botswana | ||||
see http://bit.ly/NL1Hjt and http://bit.ly/NL3F3b | Mmamabula Energy Project Stage III, Unit 2 | Mmamabula Energy Project | CIC Energy | Jindal Group | 800 | On hold | -23.609295 | 26.774952 | approximate (location of Mmamabula coal field) | Mmaphashalala | Central | Botswana | ||||
see http://bit.ly/NL1Hjt and http://bit.ly/NL3F3b | Mmamabula Energy Project Stage III, Unit 3 | Mmamabula Energy Project | CIC Energy | Jindal Group | 800 | On hold | -23.609295 | 26.774952 | approximate (location of Mmamabula coal field) | Mmaphashalala | Central | Botswana | ||||
Mmamantswe Coal Project | Mmamantswe Coal Project | African Energy Resources | 300 | Proposed | -24.4020965 | 26.5731812 | approximate (70 km north of Garabone) | Gabarone | Botswana | |||||||
Mookane Domestic Power Project | Mookane Domestic Power Project | CIC Energy | Tau Capital Group | 300? (Platts says 1200) | Subcritical | -23.6875 | 26.661389 | approximate | Mookane | Central | Botswana | |||||
Morupule B Power Station Unit 2 | Morupule B Power Station | Botswana Power Corporation | 150 | Construction | 2013 | Bituminous | Subcritical | -22.5195 | 27.037 | exact | Palapye | Botswana | ||||
Morupule B Power Station Unit 3 | Morupule B Power Station | Botswana Power Corporation | 150 | Construction | 2013 | Bituminous | Subcritical | -22.5195 | 27.037 | exact | Palapye | Botswana | ||||
Morupule B Power Station Unit 3 | Morupule B Power Station | Botswana Power Corporation | 150 | Construction | 2013 | Bituminous | Subcritical | -22.5195 | 27.037 | exact | Palapye | Botswana | ||||
http://bit.ly/NLhvTn | Sese Integrated Power Project | Sese Integrated Power Project | African Energy Resources | 300 | Proposed | -21.3787975 | 27.4405217 | approximate (50 km south of Francistown) | Francistown | North East | Botswana | |||||
Luena Katanga power station | Luena Katanga power station | Gecamines-Genl Carrieres Mines | 500 | Proposed | Subcritical | -11.133333 | 27.1 | approximate (location of Katanga) | Katanga | Democratic Republic of Congo | ||||||
Safaga Power Station Unit 1 | Safaga Power Station | Egyptian Electricity Holding Company | 650 | Proposed | 2020 | 26.733333 | 33.933333 | approximate | Safaga | Al Bahr al Ahmar | Egypt | |||||
Safaga Power Station Unit 2 | Safaga Power Station | Egyptian Electricity Holding Company | 650 | Proposed | 2020 | 26.733333 | 33.933333 | approximate | Safaga | Al Bahr al Ahmar | Egypt | |||||
Safaga Power Station Unit 3 | Safaga Power Station | Egyptian Electricity Holding Company | 650 | Proposed | 2020 | 26.733333 | 33.933333 | approximate | Safaga | Al Bahr al Ahmar | Egypt | |||||
Atuabo Valco power station | Atuabo Valco power station | Volta Aluminum Company | 1200 | Proposed | 5.5 | -2.5 | approximate (location of Western region) | Atuabo | Western | Ghana | ||||||
Ghana Coal power station Unit 1 | Ghana Coal power station | Sunon Asogli Power (Ghana) | Shenzhen Energy Group | 350 | Proposed | 2016 | 5.55 | -0.25 | approximate (location of Ghana) | Ghana | ||||||
Ghana Coal power station Unit 2 | Ghana Coal power station | Sunon Asogli Power (Ghana) | Shenzhen Energy Group | 350 | Proposed | 2016 | 5.55 | -0.25 | approximate (location of Ghana) | Ghana | ||||||
Boffa Alumina power station | Boffa Alumina power station | CPI Boffa Alumina | China Power Investment | 340 | Proposed | Subcritical | 10.184167 | -14.043889 | approximate (location of Boffa Prefecture) | Boffa | Guinea | |||||
Kaloleni Cement Plant | Kaloleni Cement Plant | Athi River Mining | 66 | Proposed | 2015 | Subcritical | -4.043477 | 39.668206 | approximate (location of Mombasa) | Kaloleni - Mombasa | Coast | Kenya | ||||
Lamu Power Project | Lamu Power Project | Lamu Power Project | 1000 | Proposed | Subcritical | -2.283333 | 40.866667 | approximate | Lamu Island | Coast | Kenya | |||||
Vipingo power station Unit 1 | Vipingo power station | Kenya Electricity Generation | 300 | Proposed | 2016 | Subcritical | 3.667 | 39.75 | approximate (Kilifi County) | Vipingo - Kilifi County | Coast | Kenya | ||||
Vipingo power station Unit 2 | Vipingo power station | Kenya Electricity Generation | 300 | Proposed | Subcritical | 3.667 | 39.75 | approximate (Kilifi County) | Vipingo - Kilifi County | Coast | Kenya | |||||
Malawi Power Station | Malawi Power Station | China Gezhouba Group | 1000 | Proposed | Subcritical | -13.254308 | 34.301525 | approximate (Malawi) | Malawi | |||||||
Central Malawi power | Central Malawi power | Malawi Coal Project | 1000 | Proposed | Subcritical | -13.966667 | 34.5 | approximate (Chipoka) | Chipoka | Central | Malawi | |||||
Chipoka Coal Plant | Chipoka Coal Plant | Intra Energy | 120 | Proposed | Subcritical | -13.966667 | 34.5 | approximate (Chipoka) | Chipoka | Central | Malawi | |||||
Kammwamba power station Unit 1 | Kammwamba power station | Kammwamba Coal Project | 50 | Proposed | Subcritical | -16.166667 | 35.166667 | approximate | Neno District | Southern | Malawi | |||||
Kammwamba power station Unit 2 | Kammwamba power station | Kammwamba Coal Project | 50 | Proposed | Subcritical | -16.166667 | 35.166667 | approximate | Neno District | Southern | Malawi | |||||
Kammwamba power station Unit 3 | Kammwamba power station | Kammwamba Coal Project | 50 | Proposed | Subcritical | -16.166667 | 35.166667 | approximate | Neno District | Southern | Malawi | |||||
Kammwamba power station Unit 4 | Kammwamba power station | Kammwamba Coal Project | 50 | Proposed | Subcritical | -16.166667 | 35.166667 | approximate | Neno District | Southern | Malawi | |||||
Kammwamba power station Unit 5 | Kammwamba power station | Kammwamba Coal Project | 50 | Proposed | Subcritical | -16.166667 | 35.166667 | approximate | Neno District | Southern | Malawi | |||||
Kammwamba power station Unit 6 | Kammwamba power station | Kammwamba Coal Project | 50 | Proposed | Subcritical | -16.166667 | 35.166667 | approximate | Neno District | Southern | Malawi | |||||
details on Units 1-3 at http://bit.ly/1fXV0lu | Jerada power station Unit 4 | Jerada power station | l’Office National de l’Electricité (ONE) | 318 | Proposed | Subcritical | 34.3096 | -2.1908 | exact | Jerada | Oriental | Morocco | ||||
detail on Units 1-4 at | Jorf Lasfar power station Unit 5 | Jorf Lasfar power station | TAQA North Africa | Abu Dhabi National Energy (TAQA) | 350 | Construction | 2014 | Bituminous | Subcritical | 33.1048 | -8.6367 | exact | Douar Oulad Zid | Doukkala-Abda | Morocco | |
Jorf Lasfar power station Unit 6 | Jorf Lasfar power station | TAQA North Africa | Abu Dhabi National Energy (TAQA) | 350 | Construction | 2014 | Bituminous | Subcritical | 33.1048 | -8.6367 | exact | Douar Oulad Zid | Doukkala-Abda | Morocco | ||
Safi power station Unit 1 | Safi power station | Safi Energy Company | GDF Suez, Nareva Holding, Mitsui | 693 | Construction | 2017 | Ultra-supercritical | 32.299392 | -9.237181 | approximate | Cap Ghir Safi | Agadir | Morocco | |||
Safi power station Unit 2 | Safi power station | Safi Energy Company | GDF Suez, Nareva Holding, Mitsui | 693 | Construction | 2017 | Ultra-supercritical | 32.299392 | -9.237181 | approximate | Cap Ghir Safi | Agadir | Morocco | |||
Benga Power Plant | Benga Power Plant | Riversdale Mining | Rio Tino | 2000? (Platts: 600) | Proposed | 2016 | -15.5 | 32.5 | approximate (Tete Province) | Songo Dist | Tete | Mozambique | ||||
Jindal Tete plant Unit 1 | Jindal Tete Power Station | Moatize power plant | Jindal Steel | 600 | Proposed | -15.5958333 | 32.7647222 | approximate (Tete Province) | Songo Dist | Tete | Mozambique | |||||
Jindal Tete plant Unit 2 | Jindal Tete Power Station | Moatize power plant | Jindal Steel | 600 | Proposed | -15.5958333 | 32.7647222 | approximate (Tete Province) | Songo Dist | Tete | Mozambique | |||||
Jindal Tete plant Unit 3 | Jindal Tete Power Station | Moatize power plant | Jindal Steel | 600 | Proposed | -15.5958333 | 32.7647222 | approximate (Tete Province) | Songo Dist | Tete | Mozambique | |||||
Jindal Tete plant Unit 4 | Jindal Tete Power Station | Moatize power plant | Jindal Steel | 600 | Proposed | -15.5958333 | 32.7647222 | approximate (Tete Province) | Songo Dist | Tete | Mozambique | |||||
Ncondezi power station | Ncondezi power station | Ncondezi Coal Company | 300 | Proposed | -15.5958333 | 32.7647222 | approximate (Tete Province) | Songo Dist | Tete | Mozambique | ||||||
Vale Tete plant | Vale Tete Power Station | Vale Moatize power plant | Vale | 300 | Proposed | -15.5958333 | 32.7647222 | approximate (Tete Province) | Songo Dist | Tete | Mozambique | |||||
Arandis Erongo power station Unit 1 | Arandis Erongo power station | Namibia Power Corporation | 150 | Proposed | -22.416667, | 14.966667 | approximate | Arandis | Erongo | Namibia | ||||||
Arandis Erongo power station Unit 2 | Arandis Erongo power station | Namibia Power Corporation | 150 | Proposed | -22.416667, | 14.966667 | approximate | Arandis | Erongo | Namibia | ||||||
Agu-Amorji power station | Agu-Amorji power station | Nigeria Coal Projects | 1000 | Proposed | Subcritical | 6.5 | 7.5 | approximate (Enugu state) | Agu-Amorji Nike | Enugu | Nigeria | |||||
Benue Coal power station Unit 1 | Benue Coal power station | Pacific Holdings | 600 | Proposed | 7.333 | 8.75 | approximate (Benue state) | Benue | Nigeria | |||||||
Benue Coal power station Unit 2 | Benue Coal power station | 600 | Proposed | 7.333 | 8.75 | approximate (Benue state) | Benue | Nigeria | ||||||||
Enugu power station | Enugu power station | ESSAR Group | 600 | Proposed | 6.452667 | 7.510333 | approximate | Enugu | Nigeria | |||||||
Gombe power station | Gombe power station | Nigeria Coal Projects | 1000 | Proposed | 10.25 | 11.166667 | approximate (Gombe state) | Gombe | Nigeria | |||||||
Kogi power station | Kogi power station | HTG Pacific and ETA Zuma Holdings | 1200 | Proposed | 2013 | 7.5477 | 7.3094 | approximate | Kogi | Nigeria | ||||||
Ogbogbo power station | Ogbogbo power station | Nigerial Coal Projects | 1000 | Proposed | 7.5693097 | 6.9843864 | approximate (Abocho) | Abocho | Kogi | Nigeria | ||||||
Sendou power station | Sendou power station | SENELEC and Korea Electric Power Corp | 125 | Development | 2015 | Subcritical | 14.689064 | -17.217628 | approximate | Sendou | Bagny | Senegal | ||||
Boikarabelo power station Unit 1 | Boikarabelo power station | CESC South Africa | RPG Enterprises | 660 | Proposed | -26 | 27.545833 | approximate | Magaliesburg | Gauteng | South Africa | |||||
Boikarabelo power station Unit 2 | Boikarabelo power station | CESC South Africa | RPG Enterprises | 660 | Proposed | -26 | 27.545833 | approximate | Magaliesburg | Gauteng | South Africa | |||||
Coal-3 power station | Coal-3 power station | Eskom | 1500 | Proposed | Bituminous | unknown | unknown | unknown | unknown | South Africa | ||||||
Elitheni power station | Elitheni power station | IPSA Group | 300 | Cancelled | Bituminous | Subcritical | -31.466 | 27.333 | approximate | Indwe | Eastern Cape | South Africa | ||||
Grootegeluk power station | Grootegeluk power station | Exxaro Resources | 600 | Proposed | -23.671667 | 27.528889 | approximate (location of Grootgeluk coal mine) | Waterberg | Limpopo | South Africa | ||||||
Khanyisa power station Unit 1 | Khanyisa power station | Anglo American | 150 | Proposed | Bituminous | -26.76955 | 29.200974 | approximate | Witbank | Mpumalanga | South Africa | |||||
Khanyisa power station Unit 2 | Khanyisa power station | Anglo American | 150 | Proposed | Bituminous | -25.876579 | 29.200974 | approximate | Witbank | Mpumalanga | South Africa | |||||
Khanyisa power station Unit 3 | Khanyisa power station | Anglo American | 150 | Proposed | Bituminous | -25.876579 | 29.200974 | approximate | Witbank | Mpumalanga | South Africa | |||||
KiPower power station | KiPower power station | KiPower and Kuyasa Mining | 600 | Bituminous | -26.14658 | 28.680861 | approximate | Delmas | Mpumalanga | South Africa | ||||||
Komati Power Station | Komati Power Station | Eskom | 360 | Construction | Bituminous | -26.09078 | 29.47446 | exact | Middleburg | Mpumalanga | South Africa | |||||
Kusile Power Station Unit 1 | Kusile Power Station | Eskom | 794.8 | Construction | 2014 | Bituminous | Supercritical | -25.9200701 | 28.924942 | exact | Witbank | Mpumalanga | South Africa | |||
Kusile Power Station Unit 2 | Kusile Power Station | Eskom | 794.8 | Construction | 2015 | Bituminous | Supercritical | -25.9200701 | 28.924942 | exact | Witbank | Mpumalanga | South Africa | |||
Kusile Power Station Unit 3 | Kusile Power Station | Eskom | 794.8 | Construction | 2016 | Bituminous | Supercritical | -25.9200701 | 28.924942 | exact | Witbank | Mpumalanga | South Africa | |||
Kusile Power Station Unit 4 | Kusile Power Station | Eskom | 794.8 | Construction | 2017 | Bituminous | Supercritical | -25.9200701 | 28.924942 | exact | Witbank | Mpumalanga | South Africa | |||
Kusile Power Station Unit 5 | Kusile Power Station | Eskom | 794.8 | Construction | 2018 | Bituminous | Supercritical | -25.9200701 | 28.924942 | exact | Witbank | Mpumalanga | South Africa | |||
Kusile Power Station Unit 6 | Kusile Power Station | Eskom | 794.8 | Construction | 2018 | Bituminous | Supercritical | -25.9200701 | 28.924942 | exact | Witbank | Mpumalanga | South Africa | |||
Matimba-B power station Unit 1 | Matimba-B power station | Eskom | 920 | Cancelled | Bituminous | -23.666667 | 27.75 | approximate | Lephalale | Limpopo | South Africa | |||||
Matimba-B power station Unit 2 | Matimba-B power station | Eskom | 920 | Cancelled | Bituminous | -23.666667 | 27.75 | approximate | Lephalale | Limpopo | South Africa | |||||
Matimba-B power station Unit 3 | Matimba-B power station | Eskom | 920 | Cancelled | Bituminous | -23.666667 | 27.75 | approximate | Lephalale | Limpopo | South Africa | |||||
Medupi Power Station Unit 1 | Medupi Power Station | Eskom | 794.8 | Construction | Bituminous | Supercritical | -23.7049731 | 27.563839 | exact | Lephalale | Limpopo | South Africa | ||||
Medupi Power Station Unit 2 | Medupi Power Station | Eskom | 794.8 | Construction | Bituminous | Supercritical | -23.7049731 | 27.563839 | exact | Lephalale | Limpopo | South Africa | ||||
Medupi Power Station Unit 3 | Medupi Power Station | Eskom | 794.8 | Construction | Bituminous | Supercritical | -23.7049731 | 27.563839 | exact | Lephalale | Limpopo | South Africa | ||||
Medupi Power Station Unit 4 | Medupi Power Station | Eskom | 794.8 | Construction | Bituminous | Supercritical | -23.7049731 | 27.563839 | exact | Lephalale | Limpopo | South Africa | ||||
Medupi Power Station Unit 5 | Medupi Power Station | Eskom | 794.8 | Construction | Bituminous | Supercritical | -23.7049731 | 27.563839 | exact | Lephalale | Limpopo | South Africa | ||||
Medupi Power Station Unit 6 | Medupi Power Station | Eskom | 794.8 | Construction | Bituminous | Supercritical | -23.7049731 | 27.563839 | exact | Lephalale | Limpopo | South Africa | ||||
Medupi West power station Unit 1 | Medupi West power station | Eskom | 800 | Deferred | Bituminous | Supercritical | Limpopo | South Africa | ||||||||
Medupi West power station Unit 2 | Medupi West power station | Eskom | 800 | Deferred | Bituminous | Supercritical | Limpopo | South Africa | ||||||||
Medupi West power station Unit 3 | Medupi West power station | Eskom | 800 | Deferred | Bituminous | Supercritical | Limpopo | South Africa | ||||||||
Medupi West power station Unit 4 | Medupi West power station | Eskom | 800 | Deferred | Bituminous | Supercritical | Limpopo | South Africa | ||||||||
Medupi West power station Unit 5 | Medupi West power station | Eskom | 800 | Deferred | Bituminous | Supercritical | Limpopo | South Africa | ||||||||
Medupi West power station Unit 6 | Medupi West power station | Eskom | 800 | Deferred | Bituminous | Supercritical | Limpopo | South Africa | ||||||||
Richards Bay Umbani power station Unit 1 | Richards Bay Umbani power station | Umbani Power | Aldwych International | 270 | Proposed | Bit | Subcritical | -28.8 | 32.1 | approximate (Richards Bay) | Richards Bay | KwaZulu-Natal | South Africa | |||
Volksrust power station Unit 1 | Volksrust power station | Eskom | 711 | Cancelled | Bituminous | -27.36 | 29.89 | approximate | Volksrust | Mpumalanga | South Africa | |||||
Volksrust power station Unit 2 | Volksrust power station | Eskom | 711 | Cancelled | Bituminous | -27.36 | 29.89 | approximate | Volksrust | Mpumalanga | South Africa | |||||
Volksrust power station Unit 3 | Volksrust power station | Eskom | 711 | Cancelled | Bituminous | -27.36 | 29.89 | approximate | Volksrust | Mpumalanga | South Africa | |||||
Arkyiai power station Unit 1 | Arkyiai power station | National Electricity Corporation | 300 | Proposed | Subcritical | 19.583333 | 35.616667 | approximate (Red Sea) | Arkyiai | Red Sea | Sudan | |||||
Arkyiai power station Unit 2 | Arkyiai power station | National Electricity Corporation | 300 | Proposed | Subcritical | 19.583333 | 35.616667 | approximate (Red Sea) | Arkyiai | Red Sea | Sudan | |||||
Maswati power station | Maswati power station | Swaziland Electricity | 1000 | Proposed | Anthracite | Subcritical | -26.316667 | 31.133 | approximate (Swaziland) | Maswati | Swaziland | |||||
Swazi Coal power station Unit 1 | Swazi Coal power station | South Ocean Holdings | 200 | Proposed | Subcritical | -26.316667 | 31.133 | approximate (Swaziland) | Maswati | Swaziland | ||||||
Swazi Coal power station Unit 2 | Swazi Coal power station | South Ocean Holdings | 200 | Proposed | Subcritical | -26.316667 | 31.133 | approximate (Swaziland) | Maswati | Swaziland | ||||||
Dar es Salaam power station | Dar es Salaam power station | Intra Energy Corporation | 400 | Cancelled | 2013-2018 | -6.823488899 | 39.26951408 | approximate | Dar es Salaam | Tanzania | ||||||
Kiwira Mine-2 power station Unit 1 | Kiwira Mine-2 power station | Kiwira Coal and Power | 50 | Construction | 2013 | -9.4850854 | 33.6703491 | exact | Mbeya | Tanzania | ||||||
Kiwira Mine-2 power station Unit 2 | Kiwira Mine-2 power station | Kiwira Coal and Power | 50 | Proposed | -9.4850854 | 33.6703491 | exact | Mbeya | Tanzania | |||||||
Kiwira Mine-2 power station Unit 3 | Kiwira Mine-2 power station | Kiwira Coal and Power | 50 | Proposed | -9.4850854 | 33.6703491 | exact | Mbeya | Tanzania | |||||||
Kiwira Mine-2 power station Unit 4 | Kiwira Mine-2 power station | Kiwira Coal and Power | 50 | Proposed | -9.4850854 | 33.6703491 | exact | Mbeya | Tanzania | |||||||
Mbalawala power station | Mbalawala power station | Intra Energy Corporation | 120 | Proposed | -11.25 | 36 | approximate (25 kilometres south of the central Ngaka mine) | Ruvuma | Tanzania | |||||||
Mbeya power station | Mbeya power station | Intra Energy Corporation | 400 | Proposed | 2013-2018 | -8.5 | 33 | approximate | Mbeya | Tanzania | ||||||
Mchuchuma power station Unit 1 | Mchuchuma power station | National Development Corporation | 150 | Proposed | 2018 | -9.25 | 34.25 | approximate | Mchuchuma | Iringa | Tanzania | |||||
Mchuchuma power station Unit 2 | Mchuchuma power station | National Development Corporation | 150 | Proposed | 2018 | -9.25 | 34.25 | approximate | Mchuchuma | Iringa | Tanzania | |||||
Mchuchuma power station Unit 3 | Mchuchuma power station | National Development Corporation | 150 | Proposed | 2023 | -9.25 | 34.25 | approximate | Mchuchuma | Iringa | Tanzania | |||||
Mchuchuma power station Unit 4 | Mchuchuma power station | National Development Corporation | 150 | Proposed | 2023 | -9.25 | 34.25 | approximate | Mchuchuma | Iringa | Tanzania | |||||
Ngaka power station | Ngaka power station | Tancoal Energy | Atomic Resources | 450 | Proposed | Subcritical | -11 | 36 | approximate | Ruvuma | Tanzania | |||||
Chipepo power station Unit 1 | Chipepo power station | Era Group (Zambia) | 250 | Proposed | Subcritical | -17.25 | 27.466667 | approximate (Sinazongwe district) | Chipepo village, Sinazongwe district | Southern | Zambia | |||||
Chipepo power station Unit 2 | Chipepo power station | Era Group (Zambia) | 250 | Proposed | Subcritical | -17.25 | 27.466667 | approximate (Sinazongwe district) | Chipepo village, Sinazongwe district | Southern | Zambia | |||||
Chipepo power station Unit 3 | Chipepo power station | Era Group (Zambia) | 250 | Proposed | Subcritical | -17.25 | 27.466667 | approximate (Sinazongwe district) | Chipepo village, Sinazongwe district | Southern | Zambia | |||||
Chipepo power station Unit 4 | Chipepo power station | Era Group (Zambia) | 250 | Proposed | Subcritical | -17.25 | 27.466667 | approximate (Sinazongwe district) | Chipepo village, Sinazongwe district | Southern | Zambia | |||||
Maamba plant Unit 1 | Maamba plant | Maamba Collieries | Nava Bharat Ventures | 150 | Construction | 2014 | -17.3403181 | 27.209149 | exact | Maamba Mine, Sinazongwe district | Southern | Zambia | ||||
Maamba plant Unit 2 | Maamba plant | Maamba Collieries | Nava Bharat Ventures | 150 | Construction | 2014 | -17.3403181 | 27.209149 | exact | Maamba Mine, Sinazongwe district | Southern | Zambia | ||||
Maamba plant Unit 3 | Maamba plant | Maamba Collieries | Nava Bharat Ventures | 150 | Proposed | 2015 | -17.3403181 | 27.209149 | exact | Maamba Mine, Sinazongwe district | Southern | Zambia | ||||
Maamba plant Unit 4 | Maamba plant | Maamba Collieries | Nava Bharat Ventures | 150 | Proposed | 2015 | -17.3403181 | 27.209149 | exact | Maamba Mine, Sinazongwe district | Southern | Zambia | ||||
Binga power station | Binga power station | French consortium | 2000 | Proposed | 2016 | -17.616667 | 27.333 | approximate | Binga | Zimbabwe | ||||||
Gokwe North power station Unit 1 | Gokwe North power station | Zimbabwe Power | Zesa Holdings | 350 | Cancelled | Lignite | -18.22 | 28.93 | approximate | Gokwe North | Midlands | Zimbabwe | ||||
Gokwe North power station Unit 2 | Gokwe North power station | Zimbabwe Power | Zesa Holdings | 350 | Cancelled | Lignite | -18.22 | 28.93 | approximate | Gokwe North | Midlands | Zimbabwe | ||||
Gokwe North power station Unit 3 | Gokwe North power station | Zimbabwe Power | Zesa Holdings | 350 | Cancelled | Lignite | -18.22 | 28.93 | approximate | Gokwe North | Midlands | Zimbabwe | ||||
Gokwe North power station Unit 4 | Gokwe North power station | Zimbabwe Power | Zesa Holdings | 350 | Cancelled | Lignite | -18.22 | 28.93 | approximate | Gokwe North | Midlands | Zimbabwe | ||||
Gwayi Mine power station Unit 1 | Gwayi Mine power station | China Africa Sunlight Energy | Shandong Taishan Sunlight | 300 | Proposed | 2015 | -20.17 | 28.58 | approximate (Bulawayo) | Gwayi | Bulawayo | Zimbabwe | ||||
Gwayi Mine power station Unit 2 | Gwayi Mine power station | China Africa Sunlight Energy | Shandong Taishan Sunlight | 300 | Proposed | 2015 | -20.17 | 28.58 | approximate (Bulawayo) | Gwayi | Bulawayo | Zimbabwe | ||||
addition to existing plant: http://bit.ly/NKLCu3 | Hwange-II power station Unit 3 | Hwange-II power station | Zesa Holdings | 300 | Proposed | 2016 | Bituminous | Subcritical | -18.3835 | 26.47 | exact | Hwange | Matabeleland North | Zimbabwe | ||
addition to existing plant: http://bit.ly/NKLCu3 | Hwange-II power station Unit 4 | Hwange-II power station | Zesa Holdings | 300 | Proposed | 2016 | Bituminous | Subcritical | -18.3835 | 26.47 | exact | Hwange | Matabeleland North | Zimbabwe | ||
addition to existing plant: http://bit.ly/NKLCu3 | Hwange III power station Unit 1 | Hwange III power station | Africa Power | 300 | Cancelled | -18.3835 | 26.47 | exact | Hwange | Matabeleland North | Zimbabwe | |||||
addition to existing plant: http://bit.ly/NKLCu3 | Hwange III power station Unit 2 | Hwange III power station | Africa Power | 300 | Cancelled | -18.3835 | 26.47 | exact | Hwange | Matabeleland North | Zimbabwe | |||||
Kariba South power station | Kariba South power station | |||||||||||||||
Lusulu power station | Lusulu power station | Lusulu Power Project | 2000 | Proposed | -17.616667 | 27.333 | approximate | Binga District | Matabeleland North | Zimbabwe | ||||||
Sengwa power station Unit 1 | Sengwa power station | Riozim | 600 | Proposed | 2015 | -18.22 | 28.93 | approximate | Gokwe North | Midlands | Zimbabwe | |||||
Sengwa power station Unit 2 | Sengwa power station | Riozim | 600 | Proposed | 2016 | -18.22 | 28.93 | approximate | Gokwe North | Midlands | Zimbabwe | |||||
Sengwa power station Unit 3 | Sengwa power station | Riozim | 600 | Proposed | 2018 | -18.22 | 28.93 | approximate | Gokwe North | Midlands | Zimbabwe | |||||
Sengwa power station Unit 4 | Sengwa power station | Riozim | 600 | Proposed | 2020 | -18.22 | 28.93 | approximate | Gokwe North | Midlands | Zimbabwe | |||||
Zimbabwe power station | Zimbabwe power station | Guangdong Bureau of Coal Geology | 1200 | Proposed | unknown | unknown | Zimbabwe |