Category talk:Proposed coal plants in Indonesia
Jump to navigation
Jump to search
Second pass
- Adipala power station
- Astratel Kalimantan power station
- Balikpapan IPP power station
- Bangko Tengah power station
- Banjarmasin (Asam-Asam)-B power station
- Banjarsari power station
- Banyuasin power station
- Banten Lontar power station
- Banten Suralaya power station
- Banten Serang power station
- Barru power station
- Bonjonegara Serang power station
- Bukit Bukaka power station
- Cikarang power station
- Cilacap Sumber power station
- Cirebon power station
- Celukan Bawang power station
- East Kutai power station
- East Lombok power station
- Jabar Utara power station
- Jambi Karya power station
- Jawa Tengah power station
- Kabil Pkb power station
- Kalteng-1 power station
- Kalsel (Asam-Asam) power station
- Kaltim Teluk Balikpapan power station
- Karang Asem power station
- Keban Agung (Ss-2) power station
- Kuala Tanjung-1 power station
- Labuhan Angin power station
- Lampung power station
- Madura PTBA power station
- Merak power station
- Meulaboh power station
- Muara Enim (SS-6) power station
- Mulut Tambang (SS-9) power station
- Nagan Raya power station
- Pacitan power station
- Paiton III power station
- Paiton Baru power station
- Pangkalan Susu power station
- Parit Baru power station
- Pekanbaru Tenayan power station
- Perawang Mill power station
- PJB Project
- Punagaya power station
- Riau Minemouth power station
- South Sumatra IPP power station
- Sulawesi Tenaga power station
- Sumsel (SS-5) power station
- Sumsel (SS-7) power station
- Tanjung Awar-Awar power station
- Tanjung Jati A power station
- Tanjung Jati B power station
- Tanjung Kasam power station
- Tanjung Pasir power station
- Teluk Sirih power station